Laserfiche WebLink
Public Works Memorandum <br /> NO. 2009-49 <br /> DATE: June 25, 2009 <br /> TO: Honorable Mayor McElroy and City Council <br /> Q l�( Y �P <br /> FROM: Ryan P. McCrady, City Manager Y rj�t <br /> Richard G. Marley, P.E., Director of Public Works t��•��� <br /> SUBJECT: Street Restoration, City Project 09-08, Section No. 09-00908-00-FP <br /> SUMMARY RECOMMENDATION: It is recommended by staff that the City Council <br /> approve the attached resolution awarding the contract for Street Restaration, City Project 09-08, <br /> to Dunn Company, A Division of Tyrolt, Inc., as the lowest, responsible bidder in the amount of <br /> $2,242,439.35, and that the Mayor be authorized to execute the contract and the City Clerk to <br /> attest. <br /> BACKGROUND: <br /> Prior Council Action <br /> March 28, 2009, in Study Session for the Capital Improvement Plan review, City Council <br /> received maps and location tables identifying streets recommended for improvement during <br /> 2009. The Street Restoration Project is an annual street improvement project for the City. <br /> Apri120, 2009 - Council approved Resolution R2009-53 appropriating $2,200,000 of Motor <br /> Fuel Tax funds for the purpose of resurfacing streets and highways under the applicable <br /> provisions of the Illinois Highway Code. <br /> Streets Inspected Annually <br /> The Engineering Division inspects and rates approximately 1/2 ofthe City's streets on a yearly <br /> basis. The results of these inspections are input into a computer database which is used to <br /> project the future condition of the streets based on their current condition, historical condition, <br /> surface type (i.e. brick, concrete, asphalt, etc.), average daily traffic, and traffic type (i.e. trucks, <br /> cars, etc.). This data is then paired with available funding and is used as a basis to aid City <br /> Engineering in the preparation of the City's yearly street improvement program. Staff then <br /> determines which streets need to have the surface overlaid or be totally reconstructed. <br /> Project Description <br /> This year's Street Restoration Project is focused toward reconstructing existing streets that have <br /> exceeded their usefizl life and restoring them to new condition. This work involves pulverizing <br /> the existing pavement and base together and then regrading the base to the proper crown and <br /> then stabilizing the base by mixing cement into the base material. The stabilized base is then <br /> overlaid with 3 inches of asphalt. This work should result in a new street with a life that could <br /> last 50 or more years with normal maintenance and overlay work. <br /> Page � 1 <br />