Laserfiche WebLink
� � <br /> Public Works Memorandum <br /> NO. 2009-40 <br /> DATE: June 4, 2009 <br /> TO: Honorable Mayor McElroy and City Council <br /> FROM: R an P. McCrad Ci Mana er �'" � <br /> Y Y� tY g <br /> Richard G. Marley, P.E., Public Works Director ��`�' G�' <br /> � <br /> SUBJECT: Street Reconstruction, City Project 09-24 <br /> SUMMARY RECOMMENDATION: <br /> It is recommended by staffthat the City Council approve the attached resolution awarding the <br /> contract for Street Reconstruction, City Project 09-24, to Dunn Company, A Division of Tyrolt, <br /> Inc., as the lowest, responsible bidder in the amount of$735,311.16, and that the Mayor be <br /> authorized to execute the contract, and the City Clerk to attest. <br /> BACKGROUND: <br /> Prior Council Action <br /> On March 28, 2009, in Study Session for the Capital Improvement Plan review, City Council <br /> received maps and location tables identifying streets recommended for improvement during <br /> 2009. The Street Reconstruction Project is an annual street improvement project for the City. <br /> Streets Inspected Annually <br /> The Engineering Division inspects and rates approximately 1/2 ofthe City's streets on a yearly <br /> basis. The results of these inspections are input into a computer database which is used to ' <br /> project the future condition of the streets based on their current condition, historical condition, <br /> surface type(i.e. brick, concrete, asphalt, etc.), average daily traffic, and traffic type (i.e. trucks, <br /> cars, etc.). This data is then paired with available funding and is used as a basis to aid City <br /> Engineering in the preparation of the City's yearly street improvement program. Staff then <br /> determines which streets need to have the surface restored or be totally rebuilt. <br /> Project Description <br /> This year's Street Reconstruction Project generally involves the placement of a 1 to 2 inch <br /> asphalt surface course on an existing paved surface. A portion of the existing pavement is often <br /> milled offto reduce the impact of the overlay on existing curbs and driveways. If additional <br /> structural capacity is desired in the pavement, no milling may take place prior to the overlay. <br /> This year microsurfacing and cape seal pavement improvement processes have been added to the <br /> annual project. These processes further extend pavement life and delay the need for more <br /> expensive mill and overlay work. Microsurfacing places a thin, bituminous slurry on the surface <br /> of the pavement that cures to create a smooth durable surface. A cape seal consists of placing a <br /> traditional oil and chip surface prior to placing the smooth microsurfacing top coat. When <br /> performed at the right time, microsurfacing and cape seal treatments can last up to 10 years. <br /> Page � 1 <br />