My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2009-96 AUTHORIZING SECOND AMENDMENT TO AGREEMENT WITH HANSON PROFESSIONAL SERVICES, INC.
COD
>
City Clerk
>
RESOLUTIONS
>
2009
>
R2009-96 AUTHORIZING SECOND AMENDMENT TO AGREEMENT WITH HANSON PROFESSIONAL SERVICES, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/13/2015 1:09:36 PM
Creation date
10/13/2015 1:09:35 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2009-96
Res Ord Title
AUTHORIZING SECOND AMENDMENT TO AGREEMENT WITH HANSON PROFESSIONAL SERVICES INC. FOR LAKE DECATUR DAM REPAIRS
Department
Public Works
Approved Date
6/15/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Provide approximately 2-3 cores at the marked locations along with a core log indicating the <br /> depth of concrete and the depth of void(if present). <br /> 8. South Embankment Seepage Monitoring: It is suspected that seepage through the embankment <br /> behind the south abutment is due to the deteriorated condition of the upstream face of the dam and <br /> training walls. It is anticipated that the proposed repairs to the upstream face of the dam and training i <br /> walls may cause the seepage to stop. After the repairs are completed,Hanson will visit the site <br /> periodically to observe the south embankment for signs of seepage. Continued seepage may warrant i <br /> additional work in future repair contract to investigate and repair the source of the seepage. ', <br /> 9. Record Drawings: Contract specifications require the Contractor to provide a red-lined set of marked <br /> contract documents to the City as a record to illustrate the final as-built condition of the proposed <br /> repairs. Hanson and HDR will record any changes to the electronic version of the project plans and <br /> specifications and provide electronic and hard copies for the City's records. <br /> The Cost of Services is modified as follows: <br /> Cost of Services in Agreement $ 83,400 <br /> Total of Previous Amendments $ 26,700 <br /> Increase this Amendment($129,282) as follows: <br /> • Bid Evaluation $ 2,540 <br /> • Pre-Construction Meeting $ 1,897 <br /> • Construction Observation $ 81,485 <br /> • Contractor Submittal Review $ 11,519 <br /> • Contractor Pay Request Review $ 1,897 <br /> • Apron Slab Condition Survey $ 8,440 <br /> • Apron Slab Void Detection Survey $ 16,271 <br /> • South Abutment Embankment Monitoring $ 1,657 <br /> • Record Drawings 3 576 <br /> Cost of Services with all Amendments $239,382 <br /> Client and Hanson hereby agree to and accept the terms as stated herein. <br /> Hanson Professional Services Inc. City of Decatur <br /> (i <br /> � � <br /> By: a By: <br /> e .,, all,P.E. <br /> t �,,.,, <br /> Title: Senior Vice President Title: Mayor <br /> Date: OCp�03�0� Date: June 15, 2 0 0 9 <br /> ATTEST: `" <br /> / � <br /> � �C.x-f ,% � ��, - Ge�t�t'C� <br /> �C;!� HANSON City Cle�'k � <br /> PSA fCmendment Rev.3 3 <br /> I:\08jobs\08L0198�Admin\05-Agreements\PSA Amendment 2.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.