7. Apron Slab Void Detection Survey: Previous repair projects at the Lake Decatur Dam have included <br /> work to investigate the presence of voids under the apron slab and to fill the voids with flowable <br /> grout. In order to evaluate the presence of any additional voids under the slab, Hanson will engage <br /> the services of AECOM Technical Services, Inc. (ATS)to use Ground Penetrating Radar(GPR)to <br /> investigate the area under the slab for voids. Services to be provided by ATS for the Project are as <br /> follows: <br /> a. GROUND PENETRATING RADAR SURVEY <br /> ATS will provide 2 trained non-destructive testing specialists and suitable GPR equipment to <br /> achieve the project objectives. The project will be divided into two phases,a Trial Phase and a <br /> Production Phase. <br /> Trial Phase <br /> The Trial Phase includes a site mobilization/demobilization from ATS's Milwaukee office and <br /> adequate time to test various GPR antennae at the site. The purpose of the Trial Phase will be to <br /> calibrate the GPR equipment to site conditions and deternune the useful extent of radar energy <br /> penetration. Following initial data collection in the Trial Phase,the GPR crew will consult with <br /> Hanson Professional Services,Inc. staff on site to decide if the GPR data provides the <br /> information required. If insufficient value is derived from the GPR data,the project will <br /> terminate and ATS will demobilize and invoice for this phase only, without any equipment <br /> charges. <br /> Production Phase <br /> The Production Phase will include a GPR survey of selected transects (survey lines)parallel to <br /> the dam face. Full-length data lines will be conducted at about two(2)-foot intervals with exact <br /> locations to be deternuned on site. This will result in approximately twenty(20)500-foot passes. <br /> In areas where potential anomalies are located at the concrete/sub-base interface transects will be <br /> made perpendicular to the previous transects to deternune the extent of the anomaly. The <br /> Production Phase will begin immediately upon completion of the Trial Phase. <br /> ATS will return the GPR data to the office where it will be analyzed for anomalies and trends. <br /> Five copies of a final report will be prepared. The report will discuss the equipment and <br /> procedures used during the survey and will present the results in a plan view of the apron slab. <br /> The plan view will include the position along each transect of each anomaly imaged to the nearest <br /> foot. The size of each anomaly will be estimated and reported. <br /> ATS will mark selected locations on the apron slab for the purpose of ground truthing/calibrating <br /> the GPR data. A total of approximately 2-3 cores will be marked. <br /> b. SERVICES PROVIDED BY CONTRACTOR <br /> Provide a clean,unobstructed access to the apron slab for the data collection vehicle (van). <br /> Provide a dry and clean surface of the apron slab for the data collection. <br /> <��� HANSON <br /> PSA Amendment Rev.3 2 <br /> 1:�08jobs\08L0198�Admin�05-Agreements�PSA Amendment 2.doc <br />