R2009-96 AUTHORIZING SECOND AMENDMENT TO AGREEMENT WITH HANSON PROFESSIONAL SERVICES, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/13/2015 1:09:36 PM
Creation date
10/13/2015 1:09:35 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2009-96
Res Ord Title
AUTHORIZING SECOND AMENDMENT TO AGREEMENT WITH HANSON PROFESSIONAL SERVICES INC. FOR LAKE DECATUR DAM REPAIRS
Department
Public Works
Approved Date
6/15/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Amendment No. 2 to <br /> Agreement C08L0198 <br /> Whereas, the City of Decatur, subsequently referred to as "Client,"and Hanson Professional Services Inc., I <br /> subsequently referred to as"Hanson,"have previously entered into a Professional Services Agreement dated I <br /> December 29, 2008 in connection with the Lake Decatur Dam Repairs subsequently referred to as"Project,"and <br /> Whereas, the Client has ordered certain changes to the services being provided by Hanson for the Project. <br /> Now,therefore,this Amendment to the Agreement(Amendment No. 2)is made this 19th day of May, 2009 to <br /> revise the Scope of Services and Cost of Services as provided herein. All other terms and conditions of the <br /> Agreement remain unchanged. <br /> The Scope of Services is modified as follows to provide construction related services in 2009: <br /> 1. Bid Evaluation: <br /> a. Respond to contractor's request for information(RFI)during the bidding period;prepare written <br /> responses to RFI's for distribution by the City to all bidders; prepare written addenda, as required <br /> by RFI's, for distribution by the City to all bidders. <br /> b. Review contractor's bids for work described in the plans and specifications. <br /> c. Provide a written recommendation to the City of Decatur of the apparent lowest,responsible <br /> bidder. <br /> 2. Pre-Construction Meeting: Attend on-site pre-construction meeting to discuss project scope with the <br /> selected contractor. HDR will participate via teleconference to discuss the scope of work prepared by <br /> their firm. <br /> 3. Construction Observation: <br /> a. Hanson and�-IDR will visit the site periodically, as directed by the City's on-site representative to <br /> assist with observation of the work for compliance with the contract documents. <br /> b. Assume Hanson's on-site representative(s)will visit the site an average of three(3)times per <br /> week for a duration of 22 weeks, plus expenses for travel to the site. <br /> c. Assume three on-site visits by HDR representatives to observe the work for the bascule and sluice <br /> gate work. <br /> 4. Contractor Submittals: Review submittals prepared by the Contractor for items specified to be <br /> included in the work for conformance with the project specifications. <br /> 5. Contractor Pay Requests: Review requests for payment by the Contractor for agreement with <br /> observed progress of the work. <br /> 6. Apron Slab Condition Survey: In order to evaluate the condition of the surface of the downstream <br /> apron slab, the project specifications require the Contractor to dewater and clean the surface. Hanson <br /> will observe and document areas of the apron slab which require repairs and use this information to <br /> prepare construction documents for the anticipated 2010 construction contract. <br /> <� HANSON <br /> � <br /> PSA Amendment Rev.3 � <br /> I:�OSjobs�08L0198�Admin�05-Agreements�PSA Amendment 2.doc <br />