Laserfiche WebLink
� � � Attachment B <br /> ' UI�S Corporation <br /> � Prepared By: KWB Date: 3/30/2009 <br /> Checked By: TDN Date: 3/30/2009 <br /> City of Decatur-Replacement of South Shore Drive Bridge over Sand Creek Arm of Lake Decatur(SN 058-6003) <br /> Fee Estimate-Phase I <br /> Activi PM En Sr.En SE Tech Surve Totals <br /> Pro'ect Admin&Coordination <br /> Pro'ect Initiation Pa erwork 2.0 2.0 <br /> Pre are Safe Work Plan 3.0 3.0 <br /> Pre are PXP 4.0 4.0 <br /> Pro'ect Kickoff Meetin 1.0 1.0 1.0 1.0 1.0 5.0 <br /> Pro'ect Administration/Invoicin 24.0 24.0 <br /> Coordination with Ci /IDOT/Sanita Dist 18.0 4.0 22.0 <br /> Total 52.0 1.0 5.0 0.0 1.0 1.0 60.0 <br /> CollecUReview Existin Data <br /> Existin Brid e&Roadwa Plans 2.0 1.0 1.0 2.0 6.0 <br /> Existin Sewer&Pi e Su ort Plans 1.0 2.0 3.0 <br /> Identi other Utili Locations 2.0 2.0 3.0 7.0 <br /> Determine Re 'd Clearance for Boaters 0.5 0.5 <br /> Total 2.5 5.0 1.0 3.0 5.0 0.0 16.5 <br /> Field/H draulic Surve &Plot Data <br /> Field Surve Brid e, Roadwa &H d. 1.0 96.0 97.0 <br /> Plot Surve Data&H d. Cross Sections 24.0 24.0 <br /> Total 1.0 0.0 0.0 0.0 24.0 96.0 121.0 <br /> Brid e Condition Re ort <br /> Pre are/Submit Brid e Condition Re rt 8.0 1.0 2.0 11.0 <br /> Total 0.0 8.0 0.0 1.0 2.0 0.0 11.0 <br /> Brid e T e Stud <br /> Coordinate Soil Borin s with SKS 1.0 1.0 <br /> Determine Brid e Cross Section 3.0 2.0 5.0 <br /> Investi ate O tions for Sewer 4.0 8.0 12.0 <br /> Establish Low Beam Elevation 0.5 0.5 <br /> Establish Centerline Rd at Brid e 2.0 1.0 3.0 <br /> Develo GP&E for 5 Brid e T es 24.0 16.0 36.0 76.0 <br /> Consider Retainin Wall O tions 6.0 8.0 6.0 20.0 <br /> Determine Prelimina Quantities 24.0 4.0 12.0 40.0 <br /> Develo Prelimina Cost Estimates 16.0 3.0 19.0 <br /> Pre are Brid e T e Stud Report 12.0 6.0 18.0 <br /> Total 4.0 90.0 0.0 46.5 54.0 0.0 194.5 <br /> Prelimina Roadwa Desi n <br /> Establish T ical Roadwa Section 2.0 4.0 3.0 9.0 <br /> Establish Horizontal Ali nment 2.0 12.0 24.0 38.0 <br /> Establish Profile for each structure e 4.0 12.0 16.0 <br /> Develo Prelimina Cross Sections 20.0 40.0 60.0 <br /> Determine Prelimina Quantities 2.0 16.0 18.0 <br /> Develo Prelimina Cost Estimates 12.0 12.0 <br /> Total 4.0 12.0 42.0 0.0 95.0 0.0 153.0 <br /> H draulic/Scour Mal sis&Re ort <br /> Perform H draulic/Scour Anal sis 60.0 12.0 72.0 <br /> Pre are/Submit H draulic R t. 16.0 2.0 18.0 <br /> Total 0.0 76.0 12.0 2.0 0.0 0.0 90.0 <br /> Prelimina Ri ht-of-Wa Work <br /> Conduct Courthouse Search 3.0 3.0 <br /> CollecUReview Tax Ma s 2.0 2.0 <br /> Overla Pro e Info On Drawin s 2.0 2.0 <br /> Total 0.0 0.0 0.0 0.0 2.0 5.0 7.0 <br /> Public Meetin <br /> Pre are Exhibits/Handouts 6.0 12.0 16.0 34.0 <br /> Conduct Meetin 4.0 4.0 4.0 12.0 <br /> Com ile/Document Comments 4.0 4.0 <br /> Total 14.0 16.0 4.0 0.0 16.0 0.0 50.0 <br /> Total This Sheet 77.5 208.0 64.0 52.5 199.0 102.0 703.0 <br /> Sheet 1 of 2 <br />