Laserfiche WebLink
' � � Attachment B <br /> Activi PM En Sr.En SE Tech Surve Totals <br /> Pre are TS&L for Local Brid e Unit <br /> Pre are/Draft TS&L 4.0 1.0 6.0 11.0 <br /> Submit TS&L 0.5 1.0 1.0 2.5 <br /> Total 0.5 5.0 0.0 1.0 7.0 0.0 13.5 <br /> A enc /Environme�tal Coordination <br /> Obtain Cor s of En ineers Authorization 1.0 4.0 5.0 <br /> Pre are/Submit ESR 0.5 4.0 4.5 <br /> Re uesUAnal e Accident Data 1.0 1.0 <br /> Pre are BLR 22120-Asbestos 1.0 1.0 <br /> Pre are/Submit Pro'ect Dev. Re ort 4.0 32.0 2.0 38.0 <br /> Total 5.5 42.0 0.0 0.0 2.0 0.0 49.5 <br /> QA/QC <br /> ITR-Brid e T e Stud 6.0 6.0 <br /> ITR-TS&L 6.0 6.0 <br /> ITR-Pro'ect Develo ment Re ort 4.0 4.0 <br /> Total 16.0 0.0 0.0 0.0 0.0 0.0 16.0 <br /> Total This Sheet 22.0 47.0 0.0 1.0 9.0 0.0 79.0 <br /> Total Previous Sheet 77.5 208.0 64.0 52.5 199.0 102.0 703.0 <br /> MH Totals 99.5 255.0 64.0 53.5 208.0 102.0 782.0 <br /> Direct Costs <br /> Mileage(Survey): 4 trip(s)x 14 miles/trip @ $0.550 /mile = $30.80 <br /> Mileage(Research): 2 trip(s)x 6 miles/trip @ $0.550 /mile = $6.60 <br /> Mileage(Meetings): 4 trip(s)x 6 miles/trip @ $0.550 /mile = $13.20 <br /> Postage: $50.00 <br /> Soil Borings(SKS): $2,900.00 <br /> Meeting Notice: $250.00 <br /> Total Direct Costs= $3,250.60 <br /> Estimated Fee <br /> Salary Multiplier= 2.70 <br /> Labor: $27,482.44 x 2.70 = $74,202.59 <br /> Direct Costs: $3,250.60 <br /> Total Estimated Fee = 577,453.19 <br /> Say E77,500.00 <br /> Sheet 2 of 2 <br />