My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2009-50 AUTHORIZING AGREEMENT WITH URS CORPORATION
COD
>
City Clerk
>
RESOLUTIONS
>
2009
>
R2009-50 AUTHORIZING AGREEMENT WITH URS CORPORATION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/14/2015 1:13:16 PM
Creation date
10/14/2015 1:13:15 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2009-50
Res Ord Title
AUTHORIZING AGREEMENT WITH URS CORPORATION FOR ENGINEERING SERVICES FOR REPLACEMENT OF SOUTH SHORES BRIDGE OVER SAND CREEK ARM OF LAKE DECATUR
Approved Date
4/20/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attachment A <br /> Work Order No. l (4/20/09) <br /> City of Decatur <br /> Phase I Engineering for Bridge Replacement <br /> South Shore Drive over Sand Creek Arm of Lake Decatur <br /> Existing SN 058-6003 <br /> A. Scope of Work <br /> The following is a summary of the proposed engineering services to be provided: <br /> 1.0 Phase I <br /> 1.1 Collect and review existing data to include existing bridge and roadway <br /> plans,plans for existing sewer pipe and supports, bridge master report, bridge <br /> inspection report,utility/water main information, and required clearances for <br /> recreational marine traffic. <br /> 1.2 Perform field survey for roadway,bridge and hydraulic cross sections, as <br /> required. This work will include preparation of the survey outline, as well as <br /> processing and plotting the survey data. <br /> 1.3 Prepare Bridge Condition Report(BCR). Based on the Sufficiency Rating of <br /> 10.9, it is anticipated that an abbreviated BCR will be required since a rating <br /> of 50 or less qualifies for total replacement using federal funds. <br /> 1.4 Conduct coordination meetings with the City of Decatur and the Decatur Park <br /> District to determine the required section for traffic and pedestrians and/or <br /> bicycles. <br /> 1.5 Conduct coordination meetings with the Decatur Sanitary District regarding <br /> the Interceptor Sewer supported on the wingwalls of the existing bridge. <br /> Investigate available options for the sewer to include relocation or re- <br /> supporting at the existing location. <br /> 1.6 Develop roadway alignment options based on the proposed cross section. <br /> 1.7 Pre are a brid e t e stud to investi ate o tions for the re lacement <br /> P g Yl� Y g P p <br /> structure type. Options to be considered include, a Precast Three-Sided <br /> Structure Steel Wide-Flan e Beams with Com osite Deck Concrete I- <br /> , g P � <br /> Beams with Composite Deck, and Pre-Engineered Steel Truss. Consider <br /> resulting raise in profile and impacts for each structure type as well as <br /> differences in overall costs for each. <br /> 1.8 Determine impacts to sewer supported on the wingwalls of the existing <br /> structure. Consider options with the sewer left in place and with the sewer <br /> relocated. Determine if additional fill will be required in Lake Decatur to <br /> support the proposed roadway section. <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.