Laserfiche WebLink
�� Local AgenCy State Contract Day Labor Local Contract RR Force Account <br /> , ���� <br /> aF T1at�spOrtatiOn City of Decatur x <br /> Local Agency Agreement Section Fund Type ITEP Number <br /> for Federal Participation 08-00503-00-BR ARU <br /> Construction En ineerin Ri ht-of-Wa <br /> Job Number Project Number Job Number Project Number Job Number Project Number <br /> C-97-092-09 ARA-5169(042) <br /> This Agreement is made and entered into between the above local agency hereinafter referred to as the"LA"and the state of Illinois, acting <br /> by and through its Department of Transportation, hereinafter referred to as"STATE". The STATE and LA jointly propose to improve the <br /> designated location as described below. The improvement shall be constructed in accordance with plans approved by the STATE and the <br /> STATE's policies and procedures approved and/or required by the Federal Highway Administration hereinafter referred to as"FHWA". <br /> Location <br /> Local Name Gafield Avenue Route FAU 7369 Length 630 Feet <br /> Termini 0.50 mile east of US 51 over IC Railroad <br /> Current Jurisdiction City of Decatur Existing Structure No 058-6000 <br /> Project Description <br /> Construction of the replacement of piers 3 and 6 on existing pile caps and micropiles. Removal and replacement of neoprene expansion <br /> joints above piers 3 and 6 along with repair to abutments and cleaning and painting of existing steel adjacent to the expansion joints. <br /> Division of Cost <br /> Type of Work FHWA % STATE % LA % Total <br /> Participating Construction 720,000 ( " ) ( ) 180,000 ( BAL ) 900,000 <br /> Non-Participating Construction ( ) ( ) � � <br /> Preliminary Engineering ( ) ( ) ( � <br /> Construction Engineering ( ) � � � � <br />, Right of Way ( ) ( ) � � <br /> Railroads ( � � � � � <br /> Utilities ( ) ( � � � <br /> TOTAL $ 720,000 $ $ 180,000 $ 900,000 <br /> * 100%ARU Funds NTE$720,000 <br /> NOTE: The costs shown in the Division of Cost table are approximate and subject to change. The final LA share is dependent on the final Federal and <br /> State participation. The actual costs will be used in the final division of cost for billing and reimbursment. <br /> If funding is not a percentage of the total,place an asterisk in the space provided for the percentage and explain above. <br /> The Federal share af construction engineering may not exceed 15%of the Federal share of the final construction cost. <br /> Local Agency Appropriation <br /> By execution of this Agreement,the LA is indicating sufficient funds have been set aside to cover the local share of the project cost and <br /> additional funds will be appropriated,if required,to cover the LA's total cost. <br /> Method of Financing(State Contract Work) <br /> METHOD A--Lump Sum (80%of LA Obligation) <br /> METHOD B-- Monthly Payments of <br /> METHOD G—LA's Share Balance divided by estimated total cost multiplied by actual progress payment. <br /> (See page two for details of the above methods and the financing of Day Labor and Local Contracts) <br /> Printed on 4/14/2009 Page 1 of 4 BLR 05310(Rev.03/26/08) <br />