Laserfiche WebLink
� Memorandum <br /> v <br /> Foth <br /> Task 3.8—Light pole and luminaire details <br /> Task 4—Drawing and Specification Production <br /> Task 4.1 —Drawing production <br /> Task 4.2—Technical specification for lighting <br /> Task 4.3 —Pay item list and quantities <br /> Task 4.4—Opinion of probable construction cost <br /> Phase III—Construction: To Be Determined <br /> Proposed Deliverables: <br /> Bid Drawings for incorporation in IDOT construction documents <br /> General notes and summary of quantities <br /> Demolition plan and temporary lighting <br /> Lighting plans (3 sheets) <br /> Circuit diagram <br /> Luminaire performance table <br /> Controller details (Modified IDOT Standard) <br /> Pole standards and details <br /> Detail for night time lighting inspection(IDOT LGT 017-M32) <br /> Technical Specifications <br /> Opinion of probable construction cost <br /> Scope Notes: <br /> 1. The selection of the lighting equipment(light fixtures and poles) shall be provided by the <br /> City. Foth will select distribution required by the photometric design. <br /> 2. The selection of the light source shall be by the City. Light source choice shall include <br /> source type (such as metal halide) and color. <br /> The information contained in this memorandum is considered privileged and confidential and is <br /> intended only for the use of recipients and Foth. <br /> 1610 Broadmoor Drive Champaign,IL 61821 (217)352-4169 Fax:(217)352-0085 <br /> X:\CI-nIE�2008\08DO15U000 budget�Proposals\08D015 Franklin Bridge Lighting Scope rev 1-12-09.doc 3 <br />