My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2009-04 AUTHORIZING AGREEMENT HANSON PROFESSIONAL SERVICES, INC.
COD
>
City Clerk
>
RESOLUTIONS
>
2009
>
R2009-04 AUTHORIZING AGREEMENT HANSON PROFESSIONAL SERVICES, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/14/2015 3:41:40 PM
Creation date
10/14/2015 3:41:40 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2009-04
Res Ord Title
AUTHORIZING AGREEMENT HANSON PROFESSIONAL SERVICES, INC. LAKE DECATUR DAM SPILLWAY STRUCTURE REPAIRS 2009
Approved Date
1/20/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Professional Services Agreement <br /> C08L0198 <br /> Attachment A - Scope of Services <br /> Agreement Date: December 29 2008 <br /> Project:Lake Decatur Dam Spillway Structure Repairs <br /> Project Description: <br /> Provide professional services to develop construction documents for repairs to the concrete spillway structure, <br /> spillway gates,and erosion protection at the dam. <br /> Services: <br /> The proposed rehabilitation of the Lake Decatur Dam Spillway will include repair and rehabilitation of the <br /> spillway structure. In addition, further investigation of certain conditions will be investigated during construction <br /> or monitored for purposes of determining the appropriate repair recommendations. Hanson Professional Services <br /> Inc. pcoposes to provide the following professional services: <br /> 2009 Construction Season <br /> 1. Prepare detailed plans and specifications for concrete repairs to the upstream side of the spillway which <br /> were not completed as part of the 2005 construction project. <br /> 2. Prepare detailed plans and specifications for the following work to the downstream side of the spillway: <br /> a. Training Wall between Gated Outlet Works and Spillway <br /> i. Inject cracks on both sides of the wall. <br /> ii. Replace deteriorated sections of the cap along the top of the wall. <br /> iii. Repair spalled concrete area at the top of the wall on the south (spillway) side of the wall. <br /> iv. Repair spalled concrete area near El. 590'-0"where the training wall and spillway <br /> intersect. <br /> b. North and South Sections of the Spillwav. <br /> i. Concrete repair,joint sealant, and application of an impermeable membrane over a 50 ft <br /> wide test section of the spillway. The membrane will only be placed on one-half of the <br /> repair area. <br /> <� HANSON <br /> � <br /> PSA Rev.2 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.