My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2009-04 AUTHORIZING AGREEMENT HANSON PROFESSIONAL SERVICES, INC.
COD
>
City Clerk
>
RESOLUTIONS
>
2009
>
R2009-04 AUTHORIZING AGREEMENT HANSON PROFESSIONAL SERVICES, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/14/2015 3:41:40 PM
Creation date
10/14/2015 3:41:40 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2009-04
Res Ord Title
AUTHORIZING AGREEMENT HANSON PROFESSIONAL SERVICES, INC. LAKE DECATUR DAM SPILLWAY STRUCTURE REPAIRS 2009
Approved Date
1/20/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ii. Replace the concrete stair at the north and south end of the spillway. <br /> iii. Replace all seals on the bascule gate. <br /> iv. Repairs to electric heaters and conduits of hydraulic cylinders. <br /> v. Repairs to hydraulic gate cylinders. <br /> vi. Specify taking of concrete cores at intervals along the stilling basin apron slab to evaluate <br /> possible slab undermining. <br /> c. South Abutment and Training Walls <br /> i. Include an alternate bid item in the contract documents for additional work to investigate <br /> the origin of the leak from the back side of the training walls. The items would include <br /> work to excavate the embankment,make repairs to back side of the wall, inject cracks, or <br /> install waterproofing measures on these walls. <br /> ii. Repair erosion and place new slopewall at the west end of the downstream training wall. <br /> d. Gated Outlet Structure <br /> i. Inject the crack and repair spalled concrete along the top of the center wall at the crack. <br /> ii. Repair spalled concrete areas located on: the south training wall near the gate; near the <br /> top of the north gate; and at a corner on the north training wall. <br /> iii. Dewater the area in front of the gates to allow a detailed investigation of the seals of bolh <br /> gates. Include an alternate bid item to replace the seals if required. <br /> iv. Placement of erosion control measures to address the scoured area downstream of the <br /> apron <br /> v. Repair, clean and paint sluice gate guides. <br /> 3. Prepare detailed plans and specifications to improve erosion control measures at the downstream left bank <br /> storm sewer. <br /> 4. Observations and Investigations <br /> a. Perform field condition survey by boat along the downstream face of the spillway in order to <br /> assess the proposed limits for the joint repairs. <br /> b. HDR Engineering will: perform site observations, investigate repair alternatives; and make <br /> recommendation for the repairs to bascule and sluice gate seals, gate hydraulic cylinders, and gate <br /> heaters. <br /> c. Monitor the performance of the membrane test area for one year. Hanson will make 3 site visits <br /> over a one-year period after construction to observe the condition of the membrane. <br /> <��'� HANSON <br /> � <br /> PSA Rev.2 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.