Laserfiche WebLink
Excerpts from Plan Commission Minutes of August 7, 2008 <br /> violation and when the petition for the proposed parking exp ion was submitted staff <br /> recommended they rezone the property to PD to bring the church in co pliance. <br /> Mr. Terry Smith asked about the planned extension to Fair Oaks Driv . Ms. Ashe stated there is <br /> not a plan submitted at this time. She said if the property is converte to a PD the church would <br /> have to come before the Plan Commission again if access to Fair Oaks Drive is desired. <br /> Mr. Phil Cochran, representative, was sworn in by Mrs. Poland. <br /> Mr. Cochran stated in the beginning this started as a site plan to ex and the parking and City <br /> staff asked for a rezoning of the property due to the mixed use on th site. There is the church, <br /> single family residence for emergency purposes provided at no cha ge and a coffee shop and <br /> book store. The church was not aware that there would be an issu with the coffee shop and <br /> bookstore considering they feel it is part of the church ministry. Th church has a demand for <br /> more parking. If parking is not available they will lose members. <br /> The church sent out over four hundred (400) letters to area residents to invite them to an open <br /> house to look at the plans for the parking lot expansion. Fifteen (15) to twenty-five (25) people <br /> came to the meeting to view the plans. Questions of drainage and a ess were addressed. The <br /> church has a fifty foot (50) easement across the property which co ects to Fair Oaks Drive. <br /> There is no intent to access Fair Oaks Drive at this time. Staff has in icated that any change in <br /> the future would have to be before the Plan Commission. All the pro isions for City Ordinances <br /> have been met with the PD submittal. <br /> Mr. Cochran stated one (1) item of staff's recommendation is that i the church ever adds on <br /> traditional buildings it will provide a looped water main system. It 'll not provide looping for <br /> the construction of the parking lot expansion, only when additional bui dings are constructed. <br /> Mr. Cochran said he is aware of some opposition for the projec . He feels this is from <br /> misinformation of what the church is planning to do. <br /> Ms. Elayna Sadorus thanked the church for providing the home the offer to the community. <br /> She is aware of two (2) families that have used the house. She w uld also like for staff to <br /> reconsider designating a coffee shop in a church as commercial. As an architect she sees that <br /> coffee shops in churches are a matter of routine. Commercial use co ld possibly be defined by <br /> square footage. <br /> Mr. Mickler asked where the house was located. Mr. Cochran said i was on MacArthur Road <br /> immediately south of one (1) of the entrances. There are actually two (2) homes which are used <br /> for emergency housing needs as well as for missionaries that pass thro gh the area. <br /> Mr. Mickler also asked if the current retention pond would be adequ te to handle the drainage <br /> from the additional surface parking. Mr. Cochran replied phase one 1) parking is ac�equate as <br /> built and once phase two (2) is built the retention would have to be ex anded to the north. There <br /> is adequate room to do this. <br /> Mr. William T. Waynewright was sworn in by Mrs. Poland. <br />