Laserfiche WebLink
(c) Provisions are made to manage storm water by an off-site facility. The off-site <br /> facility must be in place and designed to provide the level of storm water control <br /> that is equal to or greater than that which would be afforded by on-site practices. <br /> Further, the facility must be operated and maintained by an entity that is legally <br /> obligated to continue the operation and maintenance of the facility. <br /> (d) It is demonstrated to the satisfaction of the City Engineer that the waiver will not <br /> lead to any of the following conditions downstream: <br /> (1) Deterioration of existing culverts, bridges, dams, and other structures; <br /> (2) Accelerated streambank or streambed erosion or siltation; <br /> (3) Increased threat of flood damage to public health, life or property; <br /> (4) Degradation of biological functions or habitat. <br /> 8. LAND DISTURBANCE PERMIT NOT TO BE ISSUED WHERE WAIVER <br /> REQUESTED. No land disturbance permit shall be issued where a waiver has been requested <br /> until the waiver is granted. If no waiver is granted, the plans must be resubmitted with a storm <br /> water pollution prevention plan. <br /> 9. APPLICATION FOR A LAND DISTURBANCE PERMIT. <br /> (a) Each application shall include the following: <br /> (1) The name, address, and telephone number of the property owner; <br /> (2) The address and legal description of subject property including the <br /> tax parcel number of the subject property; <br /> (3) Name, address and telephone number of the contractor and any <br /> subcontractor(s) who shall perform the land disturbing activity and <br /> who shall implement the erosion and sediment control plan; <br /> Page 1�? <br />