Laserfiche WebLink
(4) A description of the nature, extent and purpose of the land <br /> disturbing activity including the size of the area for which the <br /> permit will be applicable; <br /> (5) A description of the intended sequence of major activities which <br /> disturb soils for major portions of the site (e.g. grubbing, <br /> excavation, grading); <br /> (6) The name of the receiving water(s), or if the discharge is through a <br /> municipal separate storm sewer, the name of the municipal <br /> operator of the storm sewer and the ultimate receiving water(s); <br /> (7) Copy of the Notice of Intent submitted, if required, to the Illinois <br /> Environmental Protection Agency; <br /> (8) The applicant shall obtain from any other state or federal agency <br /> any other appropriate environmental permits that pertain to the <br /> property. However, the inclusion of those permits in the <br /> application shall not prohibit the City of Decatur from imposing <br /> additional development requirements and conditions, <br /> commensurate with this Ordinance, on the development of <br /> property covered by those permits. <br /> (b) Each application shall be accompanied by: <br /> (1) A storm water pollution prevention plan as required by NPDES IL R10 <br /> plus the additional information required by the City of Decatur. Said plan <br /> shall include: <br /> i. An erosion and sediment control plan as set forth in Section 15 of <br /> Page 13 <br />