Laserfiche WebLink
approved plan and the provisions of this Ordinance prior to the release of the <br /> performance bond or performance security. Provisions for a partial pro-rata <br /> release of the performance security or performance bond based on the completion <br /> of various development stages may be made at the discretion of the City Engineer. <br /> (d) Occupation permits will not be granted until all corrections to all BMPs have been <br /> made and accepted by the City Engineer. <br /> 12. PERMIT DURATION. Every land disturbance permit shall expire and become null and <br /> void if substantial work authorized by such permit has not commenced within one hundred <br /> eighty(180) calendar days of issuance, or is not complete within eighteen (18)months from the <br /> date of the commencement of construction. <br /> 13. BMP MANUAL FOR STORM WATER POLLUTION PREVENTION PLANS., The <br /> City of Decatur adopts as its best management practices (BMP) manual the following <br /> publications, which are incorporated by reference in this Ordinance as is fully set out herein: <br /> (a) Illinois Urban Manual, latest amendment prepared by the United States <br /> Department of Agriculture, Natural Resources Conservation Services. <br /> This manual includes a list of acceptable BMPs including the specific <br /> design criteria and operation and maintenance requirements for each storm <br /> water practice. The manual may be updated and expanded from time to <br /> time, at the discretion of the governing body of the municipality, upon the <br /> recommendation of the City Engineer, based on improvements in <br /> engineering, science, monitory and local maintenance experience. Storm <br /> water facilities that are designed, constructed and maintained in <br /> Page 16 <br />