My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-13 AMENDING CITY CODE - CHAPTER 38 - STORM WATER ORDINANCE
COD
>
City Clerk
>
ORDINANCES
>
2006
>
2006-13 AMENDING CITY CODE - CHAPTER 38 - STORM WATER ORDINANCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/20/2015 2:53:49 PM
Creation date
10/20/2015 2:53:47 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
2006-13
Res Ord Title
AMENDING CITY CODE - CHAPTER 38 - STORM WATER ORDINANCE
Approved Date
2/21/2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11. PERFORMANCE BOND OR PERFORMANCE SECURITY. <br /> (a) The City of Decatur shall, at its discretion, require the submittal of a performance <br /> security or performance bond prior to issuance of a permit to ensure the permit <br /> holder conforms to the conditions and requirements of the approved storm water <br /> pollution prevention plan. The amount of the performance security or , <br /> performance bond shall be the total estimated construction cost of the structural I� <br /> and non-structural BMPs approved under the permit plus 10 percent of the total I <br /> estimated costs. <br /> The performance security shall contain forfeiture provisions for failure to <br /> complete work specified in the storm water pollution prevention plan. The <br /> applicant shall provide an itemized construction cost estimate complete with unit <br /> prices which shall be subject to acceptance, amendment or rejection by the City <br /> Engineer. Alternatively the City Engineer shall have the right to calculate the cost <br /> of construction cost estimates. <br /> (b) The performance security or performance bond shall be submitted and accepted <br /> by the City Engineer prior to the issuance of a building permit by the City of <br /> Decatur. <br /> (c) The performance security or performance bond shall be released in full only upon <br /> submission of record drawings and written certification by a registered <br /> professional engineer licensed to practice in the State of Illinois that the structural <br /> and non-structural BMPs have been installed in accordance with the approved <br /> plan and other applicable provisions of this Ordinance. The City Engineer will <br /> make a final inspection of the BMPs to ensure it is in compliance with the <br /> Page 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.