Laserfiche WebLink
measures including vegetation and non-vegetation measures, both temporary and <br /> permanent, will be detailed. Detailed construction notes and a maintenance <br /> schedule shall be included for all control measures in the plan. <br /> (o) Specific details for the construction of rock pads, wash down pads, and settling , <br /> basins for controlling erosion; road access points; eliminating or keeping soil, <br /> sediment, and debris on streets and public ways at a level acceptable to the City <br /> Engineer. Soil, sediment, and debris brought onto streets and public ways must <br /> be removed by the end of the work day by machine, broom or shovel to the <br /> satisfaction of the City Engineer. Failure to remove the sediment, soil or debris <br /> shall be deemed a violation of this Ordinance. <br /> (p) Proposed structures; location(to the extent possible) and identification of any <br /> proposed additional buildings, structures or development on the site. <br /> (q) Requirement that qualified personnel shall inspect disturbed areas of the <br /> construction site that have not been finally stabilized, structural control measures, <br /> and locations where vehicles or equipment enter or exit the site at least once every <br /> seven calendar days and within 24 hours of the end of a storm that is 0.5 inches or <br /> greater or equivalent snowfall. <br /> 16. STORM WATER MANAGEMENT PLAN REQUIREMENTS. The storm water <br /> management plan shall include sufficient information to allow the City Engineer to evaluate the <br /> environmental characteristics of the project site, the potential impacts of all proposed <br /> development of the site, both present and future, on the water resources, and the effectiveness <br /> and acceptability of the measures proposed for managing storm water generated at the project <br /> Page ��1 <br />