Laserfiche WebLink
site. To accomplish this goal the storm water management plan shall be prepared in accordance <br /> with the City of Decatur Storm Drainage Policy and include the following: <br /> (a) Soils information when a storm water management control measure depends on <br /> the hydrologic properties of soils (e.g., infiltration basins), then a soils report shall <br /> be prepared by a qualified person and submitted with the plan. The soils report <br /> shall be based upon on-site boring logs or soil pit profiles and soil survey reports. <br /> The number and location of required soil borings or soil pits shall be determined <br /> based on what is needed to determine the suitability and distribution of soil types <br /> present at the location of the control measure. <br /> (b) A permanent elevation benchmark shall be identiFied in the plans to assist in the <br /> periodic inspection of the facility using the North American Vertical Datum of <br /> 1988 (NAVD). <br /> (c) A landscaping plan detailing the revegetation of the site after the construction is <br /> Einished as set forth in Section 17 of this Ordinance. <br /> (d) A maintenance plan for all storm water management facilities to ensure the <br /> continued performance of the facilities subject to the approval of the City Engineer. <br /> The plan shall: <br /> (1) Identify the parts or components of said facilities that need to be <br /> maintained and inspected; <br /> (2) Provide det�liled maintenance and repair procedures for the said facilities; <br /> (3) Identify ciecessary trainin�;, sl�ills or certifications that may be required to <br /> maintain, operate or repair uly of the said facilities; <br /> Page 22 <br />