My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2008-171 ACCEPTING THE BID AND AUTHORIZING A CONTRACT
COD
>
City Clerk
>
RESOLUTIONS
>
2008
>
R2008-171 ACCEPTING THE BID AND AUTHORIZING A CONTRACT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2015 10:20:39 AM
Creation date
10/21/2015 10:20:37 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2008-171
Res Ord Title
ACCEPTING THE BID AND AUTHORIZING THE EXECUTION OF A CONTRACT 300 BLOCK NORTH WATER STREET PLAZA
Approved Date
10/20/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OCT-14-2008 99�53 P.02i02 <br /> 5130 Hidcory Paint Frontage Road <br /> Suite 2 <br /> Decatur,IL 62526 • • • � • , <br /> (21�67�3333 � <br /> (21�87�3371 �AX <br /> pNiLoYVc�r�nc�.net EaIAAIL <br /> r0: Matt Newel�,P.E. � � <br /> City Eng�nser � <br /> ;. <br /> FROM: Phillip W,CoChran,P.E. � <br /> DAT�: iO/7M08 <br /> SUB.IEGT: 300�lodc M WaMr Streert <br /> Plaza Project <br /> PYMC PROJECT#: 704G <br /> CITY OF DECATUR PRO.IECT: 07d3P <br /> As a part of my professional services to the City of Decatur for the subject project I am to assist <br /> the Cih+in the taking of bids and prepare a recommendadon for award after the bids have been reviewed. <br /> As you are aware bids were opened yesterday for the project. <br /> There were a Gotal of three bids r'eceived ranging from a low of$257,036.57 from Otto Baum to a <br /> high of$364,�387.80 fiom M'td States. <br /> I have reviewed all of the bids and am very comfvrtable in recommending that the City aw�rd the <br /> contract to Otto Baum Co_ Inc.accepdng their bid which totais$257,036.57. I have discussed the <br /> aggressive prDject schedule with Otto Baum's nepresentative and was assured that the schedule wrould <br /> be met <br /> TOTAL P.02 <br />
The URL can be used to link to this page
Your browser does not support the video tag.