Laserfiche WebLink
OCT-14-2008 99�53 P.02i02 <br /> 5130 Hidcory Paint Frontage Road <br /> Suite 2 <br /> Decatur,IL 62526 • • • � • , <br /> (21�67�3333 � <br /> (21�87�3371 �AX <br /> pNiLoYVc�r�nc�.net EaIAAIL <br /> r0: Matt Newel�,P.E. � � <br /> City Eng�nser � <br /> ;. <br /> FROM: Phillip W,CoChran,P.E. � <br /> DAT�: iO/7M08 <br /> SUB.IEGT: 300�lodc M WaMr Streert <br /> Plaza Project <br /> PYMC PROJECT#: 704G <br /> CITY OF DECATUR PRO.IECT: 07d3P <br /> As a part of my professional services to the City of Decatur for the subject project I am to assist <br /> the Cih+in the taking of bids and prepare a recommendadon for award after the bids have been reviewed. <br /> As you are aware bids were opened yesterday for the project. <br /> There were a Gotal of three bids r'eceived ranging from a low of$257,036.57 from Otto Baum to a <br /> high of$364,�387.80 fiom M'td States. <br /> I have reviewed all of the bids and am very comfvrtable in recommending that the City aw�rd the <br /> contract to Otto Baum Co_ Inc.accepdng their bid which totais$257,036.57. I have discussed the <br /> aggressive prDject schedule with Otto Baum's nepresentative and was assured that the schedule wrould <br /> be met <br /> TOTAL P.02 <br />