My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2008-125 AUTHORIZING AGREEMENT
COD
>
City Clerk
>
RESOLUTIONS
>
2008
>
R2008-125 AUTHORIZING AGREEMENT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/22/2015 8:42:40 AM
Creation date
10/22/2015 8:42:39 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2008-125
Res Ord Title
AUTHORIZING AGREEMENT BLANK, WESSELINK, COOK & ASSOCIATES, INC. FOR ENGINEERING SERVICES TO PREPARE REHABILITATION PLANS AND PROJECT MANUAL FOR THE GARFIELD AVENUE OVERPASS
Approved Date
8/18/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� II <br /> Engineering& Infrastructure Memorandum <br /> NO. 2008-66 <br /> DATE: August 12, 2008 <br /> TO: Honorable Mayor Carrigan <br /> City Council Members <br /> FROM: John A. Smith, Interim City Manager �� - <br /> Richard G. Marley, P.E., Director of Eng' eering In as cture <br /> Matthew C.Newell, P.E., City Engin <br /> SUBJECT: Agreement with Blank, Wesselink, Cook& Associates to Prepare <br /> Rehabilitation Plans and Project Manual for Garfield Avenue Bridge, City <br /> Project 04-27 <br /> SUMMARY RECOMMENDATION: <br /> It is recommended by staff that the City Council approve the attached resolution approving an <br /> expenditure of$15,000 with Blank, Wesselink, Cook&Associates, (BWC), for engineering <br /> services to update Rehabilitation Plans and Project Manual for the Garfield Avenue Bridge over <br /> the CNIC tracks (between Clinton Street and Illinois Street), City Project 04-27. <br /> BACKGROUND: <br /> On September 6, 2005, the City Council awarded a contract to BWC to provide professional <br /> design services to rehabilitate the Garfield Avenue Bridge. Previous inspections of the bridge <br /> had determined that some portions of the structure were deteriorating and in need of repair. <br /> During the design process, it was determined that the deterioration noted in previous bridge <br /> inspections did not pose an imminent threat to the safety of the bridge and the public. <br /> Rehabilitation work would eventually be necessary on the bridge but it was determined that the <br /> rehabilitation could be delayed. No weight restrictions were necessary for the bridge at that <br /> time. Funding limitations and project priorities in the City's Capital Improvement Plan made it <br /> necessary to delay the bridge work further into the future. Staffrecommended to the City <br /> Council that BWC be retained to provide a follow-up structural review of the b'ridge to determine <br /> the feasibility of delaying the project. <br /> On June 16, 2008, City Council awarded a contract with BWC to provide engineering services <br /> for an in depth inspection of the Garfield Avenue Bridge over the CNIC tracks. During this <br /> inspection BWC determined that two of the piers had deteriorated significantly since the last <br /> inspection and that the structure should be posted for reduced truck capacity. BWC <br /> recommended that the City request the Illinois Department of Transportation(IDOT) Bureau of <br /> Bridges and Structures, Local Bridge Unit to review the findings and analysis. A request has <br /> been made to the IDOT Bureau of Bridges and Structures, Local Bridge Unit to review, however <br /> their work is not yet complete. The bridge has been posted to prohibit overweight pernut loads. <br />
The URL can be used to link to this page
Your browser does not support the video tag.