My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2008-110 AUTHORIZING AGREEMENT WITH SKS ENGINEERS
COD
>
City Clerk
>
RESOLUTIONS
>
2008
>
R2008-110 AUTHORIZING AGREEMENT WITH SKS ENGINEERS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/22/2015 9:21:36 AM
Creation date
10/22/2015 9:21:35 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2008-110
Res Ord Title
AUTHORIZING AGREEMENT WITH SKS ENGINEERS FOR DESIGN OF FIREHOUSE #2 TOWER
Approved Date
7/7/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� <br /> �� <br /> Geotechnical Investigation �Report $3,151.50* <br /> Mobilization <br /> BaseCost=$250.00....................................................................... $250.00* <br /> Site Drilling <br /> 4 Boring @ 31.0' Each- 124 Feet @$15.50 Per Foot................. $1,922.00* <br /> Laboratory Analysis <br /> Lab Technician 5.0 Hrs. @$66.50/Hr. ................... $332.50" <br /> Geotechnical Report <br /> Principal/Prof. Engineer 4.0 Hrs. @$136.50/Hr. ................. $546.00* <br /> Secretary 2.0 Hrs. @$50.50/Hr. ................... $101.00* <br /> • Bidding/Negotiation: This phase is when bids or negotiated proposals are solicited and obtained <br /> and in which contracts are awarded. This phase will include but not be limited to: <br /> o Prepare materials for bidding <br /> o Assistance to owner in establishing list of bidders <br /> o Prequalification of bidders <br /> o Participate in pre-bid conferences <br /> o Respond to questions from bidders and prepare any clarifications or interpretations of <br /> the bidding documents <br /> o Attend bid opening <br /> o Evaluate bids <br /> o Recommend award of contract(s) <br /> o Document and distribute bidding results <br /> o Deliverables <br /> ■ Bid Results <br /> ..........................................................................................................................................$1,500.00 <br /> • Construction Phase: Acting as the owner's representative we will monitor the General Contractor <br /> who is tasked with completing the buy-out of all components in the construction contract, <br /> coordinating their delivery and installation, and facilitating the inspection process to achieve <br /> building occupancy. This phase will include but not be limited to: <br /> o Verify GC contract, insurance and bond <br /> o Contractor Pre-construction Meeting with the Design Team <br /> o Outline Site Notification procedure with contractor <br /> o Attend Weekly meetings <br /> o Schedule coordination meetings <br /> o Review mock-ups, submittals, shop drawings <br /> o Periodic Quality Control Inspections and Observations of the work for conformance with <br /> the documents. <br /> o Process Change Orders <br /> o Attend Pay Request Meetings and Payment Processing <br /> o Deliverables <br /> ■ Contractor's rolling schedules <br /> ■ Contractor's RFI, submittal and Change Request logs <br /> ■ A&E Site visit logs <br />
The URL can be used to link to this page
Your browser does not support the video tag.