My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2008-110 AUTHORIZING AGREEMENT WITH SKS ENGINEERS
COD
>
City Clerk
>
RESOLUTIONS
>
2008
>
R2008-110 AUTHORIZING AGREEMENT WITH SKS ENGINEERS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/22/2015 9:21:36 AM
Creation date
10/22/2015 9:21:35 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2008-110
Res Ord Title
AUTHORIZING AGREEMENT WITH SKS ENGINEERS FOR DESIGN OF FIREHOUSE #2 TOWER
Approved Date
7/7/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� s�s <br /> ■ Observation Reports <br /> ■ Contractor Change Order status log <br /> ■ Schedule of values <br /> .......................................................................................................................................... $8,000.00 <br /> • Contract Closeout: This phase is to facilitate the occupancy and turnover of the finished and fully <br /> commissioned project to the Owner. A certificate of substantial completion is executed to notify <br /> everyone that warranties are in effect and maintenance responsibilities have been transferred to <br /> owner. This phase will include but not be limited to: <br /> o Compile and verify completion of punch list items <br /> o Verify completion of training programs <br /> o Verify completion of Commissioning <br /> o Closeout project contracts <br /> o Complete post-occupancy evaluation <br /> o Conduct warranty reviews & submit reports <br /> o Archive documents (paper& electronic) <br /> o Complete Project Closing Request form <br /> o Deliverables <br /> ■ Certificates of Occupancy (if applicable) <br /> ■ Certificate of Substantial Completion <br /> ■ Signed-off permits (final inspections) <br /> ■ As-Built drawings <br /> ■ Completed punch-list <br /> ..........................................................................................................................................$2,000.00 <br /> • Out-of-Pocket Expenses Cost + 10% <br /> These fees do not include, nor do we believe are required, rezoning of the property, any Illinois <br /> Department of Transportation permits, Illinois Environmental Protection Agency permits <br /> (except as noted previously), landscape plan, stormwater pollution prevention plan nor the <br /> preparation of cost estimates. <br /> These fees reflect our understanding of the services you wish for us to provide on this project. <br /> If you have any questions or want to discuss these issues further, please contact me. <br /> Sincerely, <br /> SKS ENGINEERS, INC. <br /> Adrienne K. Lync , P.E. <br /> Principal <br /> O:IProposalslFireStationTower-ScopeProposalCoverLetter-HoursListed.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.