My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2008-108 ACCEPTING THE BID
COD
>
City Clerk
>
RESOLUTIONS
>
2008
>
R2008-108 ACCEPTING THE BID
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/22/2015 9:24:21 AM
Creation date
10/22/2015 9:24:21 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2008-108
Res Ord Title
ACCEPTING THE BID - HYDRA-STOP
Approved Date
7/7/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. FROM HYDRA-STOP <br /> ' Qua��coN'r�AcT�i sso7 <br /> ATTAC�.MENT A <br /> DESCRIPTiON OF SERVIC�S AND CONTR.ACT PR10E <br /> Provide the supervisian,labor,equipment and materials,t0 the extent SpeCl�ic�lly nOte�below,tv <br /> perform the fnllowing pressure installations: <br /> (1} One 3"Single Hydra-Stop..,.....:.......................... ..................................$S,SOQ.00 <br /> Gopper Pipe Type L— ]00 P.S.I. or L�ess Water Aerial <br /> Pri�is based on the following. <br /> Nurnber of personnel 1 <br /> Approximate Number of oonsecutive eight-hour days labar 1 <br /> (additianal days will be billed at�1,175.OQ p�day) <br /> Number of mobiliza�ions 1 <br /> Above price(s)inc{ude all necessary I�Iydra-Stop Fitting{s)complete with compl�ttion plug and blind <br /> flange. <br /> Pticing is laased upon infoimation provided by the Client regarding the pipe characteristics and Client <br /> acknowledges that the specific materials and equipmn�nt requirad ta perform the Services have been <br /> seleeted in reliance on this informatian. Such informatipn includes,but is not limited to all pipe <br /> climensions,pipe material,pressure flaw and ovality. If such inform�tian is inaccuratc and results in the <br /> Company's in�bility to perforrn the Services upon �tYival at the jobsite,the Client will be responsible for <br /> additional costs which may include mobilization and deanobilization if work is rescheduled or standby <br /> expenses if the crew re�msins un�1e until replacement equiprnent a�rrives. <br /> THE GEN i.. '�'ERL�IS AND CONDTTIQNS on the attxehed to tWs ContrAct Are agreed to be a p�rt of thts <br /> Contr�et. <br /> O�'F BY; ACCEPTEb BY; <br /> '�$ ("Client") <br /> (N and Title) (Name and Titic) <br /> (Point of Cvntact:Iasan Baldauf x21'n <br /> Ad(�ress for NpticeS <br /> UA'�'�+' UFFERED: June 6,2(l0$ DATE ACC�PTED: <br /> Of�icer <br /> )nitixl <br /> Uate <br />
The URL can be used to link to this page
Your browser does not support the video tag.