Laserfiche WebLink
CITY OF DECATUR � DEPARTMENT OF ENGINEERING AND INFRASTRUCTURE � • <br /> CP 08-24 �ANNUAL STREET RECONSTRUCTION �� <br /> PROJECT LOCATIONS � ' <br /> Street From To Notes <br /> E. CLEVELAND 'AV. S. MAIN ST., END OF STREET Note 1 <br /> E. FITZGERALD i RD. END OF CONCRETE S. �BALTIMORE RD.I Note 2 <br /> S. PHILLIPS DR. E. RIDGEWAY �DR.' S. �SANDCREEK DR.; Note 2 <br /> N. RAILROAD AV. E. DIVISION ST.! E. OLIVE ;ST.� Note 3 <br /> S. ;SANDCREEK DR. S. PHILLIPS DR. E. SOUTH SHORES 'DR.I Note 2 <br /> N. STATE !ST. E. WILLIAM ST. E. NORTH ST.' Note 4 <br /> Special Locations <br /> DOWNTOWN ALLEY ; I NORTH OF E.WILLIAM ST.8�WEST OF N.WATER ST. Note 4 <br /> DRIVEWAY , 2747 N.SANGAMON RD. i I i Note 5 <br /> TRANSIT CENTER NORTH OF E. PRAIRIE ST. 8�WEST OF N.JACKSON ST. Note 6 <br /> TRANSIT ADMIN. BUILDING 555 E.WOOD ST. ; Note 6 <br /> Note 1: Street in generally poor condition with high crown and low traffic volumes. Perform minor patching and overlay with Hot Mix Asphalt. <br /> Note 2: Street has very little road base under the asphalt to allow an overlay to work. Many base failures are present. Reconstruct street base. <br /> Note 3: Street is industrial and undefined. It sees very heavy trucks. A chip seal treatment will delay reconstruction. <br /> Note 4: Mill and overlay necessary due to damage caused by downtown reconstruction work. <br /> Note 5: Portions of driveway are damaged especially along the edges. Replace damaged area and overlay. (Water Department Funded) <br /> Note 6: Transit ce�ter and Administration curb and gutter repairs. (Funded by Mass Transit) <br /> Page 2 of 19 <br />