Project Name: Street Reconstruction Engineer'a Estlmate Dunn Company,A Divlsion Entler Excavadng Co.,Inc. Illinols Valley Paving Co. '
<br /> of Tyrolt,Inc. 879 N.Sunnyside Road 3151 Robbina Road �
<br /> Project Number: OS•24 724 N.Mercer Street Decatur,Illinois 62522 SpAngfleld,Illinda 62704 "�
<br /> City Engineering Dlvision Decatur,Illinols 82522
<br /> Bid Date: Friday,May 23,2008 •
<br /> Ime: 10:00 A.M.
<br /> Fund: Capital Street ProJeds,Water Fund,Trensit
<br /> Organizatlon Code: 45484516,80608078,70417022
<br /> Ob ect Code: 489070,485900,421000 I
<br /> Item
<br /> Numbe► p�`�t�^ GTY Unit Unit PAce Total Unit PAce Total Unit Price Total Unit Price Total
<br /> 21400100 GRADING AND SHAPING DITCHES 1,83 FOOT $10.00 $18,380.0 $6.00 $11,028.0 $3.25 $5,973.5 $7.10 $13,049.8 I
<br /> 25000210 SEEDING,CLASS 2A 0. ACRE $8,000.00 $3,600.0 $5,500.00 $2,475.0 $4,000.00 $1,800.0 $3,500.00 $1,575.0
<br /> 30103000 SHAPING AND GRADING ROADWAY 9,251 SQ YD $3.60 $33,303.6 $3.35 $30,990.8 $3.00 $27,753.0 $3.52 $32,563.5
<br /> 30103005 PULVERIZE,SHAPE AND COMPACT 9,251 SQ YD $2.75 $25,440.2 $2.30 $21,277.3 $4.00 $37,004.0 $2.42 $22,387.4
<br /> 35101400 AGGREGATE BASE COURSE,TYPE B 36 TON $57.50 $21,045.0 $23.00 $8,418.0 $30.00 $10,980.0 $35.00 $12,810.0
<br /> 35200300 PROCESSING SOIL-CEMENT BASE COURSE,8 INCH 9,251 SQ YD $5.80 $53,655. $5.65 $52,268.1 $7.00 $64,757.0 $5.93 $54,858.4
<br /> 35200500 CEMENT 5,550 100 WT I
<br /> $8.10 $44,955.0 $8.10 $44,955.0 $9.00 $49,950.0 $8.51 $47,230.5
<br /> 35200600 EARTH EXCAVATION 87 CU YD $52.00 $45,552.0 $40.10 $35,127.6 $25.00 $21,900.0 $36.25 $31,755.0
<br /> 40200800 AGGREGATE SURFACE COURSE,TYPE B TON $57.50 $2,587. $55.00 $2,475.0 $30.00 $1,350.0 $45.00 $2,025.0
<br /> 4030010 BITUMINOUS MATERIAL(PRIME COAT),CRS-2 1,11 GAL $3.75 $4,170.0 $2.80 $3,113.6 $3.15 $3,502.8 $2.94 $3,2gg,p
<br /> 40300600 SEAL COAT AGGREGATE,CA-16 TON $98.45 $4,4302 $100.05 $4,502.2 $28.50 $1,282.5 $105.05 $4,727.2
<br /> 40600100 BITUMINOUS MATERIAL(PRIME COAT),RC70/CSS-1h 2,11 GAL $3.60 $7,610.4 $1.90 $4,016.6 $3.15 $6,659.1 $2.00 $4,228.0
<br /> 40600625 LEVELING BIDER(AAACHINE METHOD),N50 77 TON $88.00 $68,376.0 $77.40 $60,139.8 $80.00 $62,160.0 $94.3B $73,317.7
<br /> 40600982 HOT-MIX ASPHALT SURfACE REMOVAL-BUTT JOINT 34 SQ YD $9.70 $3,327.1 $17.00 $5,831.0 $20.00 $6,860.0 $15.08 $5,172.
<br /> 40603310 HOT-MIX ASPHALT SURFACE COURSE,MIX"C",N50 1,28 TON $50.00 $103,040.0 $74.00 $95,312.0 $80.00 $103,040.0 $90.20 $116,177.6
<br /> 42300200 PORTLAND CEMENT CONCRETE DRIVEWAY PAVEMENT,6 INCH 260 SQ YD $42.00 $10,920.0 $50.50 $13,130.0 $41.00 $10,660.0 $65.85 $17,121.0
<br /> 42400200 PORTLAND CEMENT CONCRETE SIDEWALK,SINCH 2 SQ FT $4.50 $1,125.0 $6.55 $1,637.5 $6.00 $1,500.0 $7.01 $1,752.5
<br /> 44000155 HOT-MIXASPHALTSURFACEREMOVAL,11/21NCH 2,85 SQYD $3.30 $9,428.1 $4.25 $12,142.2 $6.94 $1g,827. $4.00 $11,428.0
<br /> 44001700 COMBINATION CONCRETE CURB AND GUTTER REMOVAL AND REPIACEMENT 1,461 FOOT $40.00 $58,440.0 $40.70 $59,462.7 $50.00 $73,050.0 $48.46 $70,800.0
<br /> 44000200 DRIVEWAY PAVEMENT REMOVAL 26 S�YD $20.00 $5,200.0 $30.80 $8,008.0 $12.50 $3,250,0 $19.37 $5,036.2
<br /> 44000600 SIDEWALK REMOVAL 32 SQ FT $2.00 $650.0 $3.55 $1,153.7 $3.00 $975.0 $6.02 $1,956.5
<br /> 44201705 CLASS D PATCHES,TYPE II,5 INCH 12 SQ YD $70.00 $8,400.0 $68.50 $8,220.0 $85.00 $10,200.0 $70.00 $8,400.0
<br /> 44201709 CLASS D PATCHES,TYPE III,5 INCH 80 S�YD $70.00 $5,600.0 $68.50 $5,480.0 $85.00 $6,800.0 $70.00 $5,600.0
<br /> 44201711 CLASS D PATCHES,TYPE IV,51NCH 28 SQ YD $70.00 $19,950.0 $68.50 $19,522.5 $80.00 $22,800.0 $70.00 $19,950.0
<br /> 50105220 PIPE CULVERT REMOVAL 18 FOOT $15.00 $2,775.0 $20.35 $3,764.7 $10.00 $1,850.0 $23.11 $4,275.3
<br /> 542A0217 PIPE CULVERTS,CLASS A,TYPE 1,12 INCH 9 FOOT $25.00 $2,375.0 $39.05 $3,709.7 $65.00 $6,175.0 $45.32 $4,305.4
<br /> 542D0217 PIPE CULVERTS,CLASS D,TYPE 1,12INCH 16 FOOT $23.00 $3,795.0 $32.45 $5,354.2 $30.00 $4,950.0 $35.94 $5,930.1
<br /> 54213657 PRECAST REINFORCED CONCRETE FLARED END SECTIONS,12 INCH EACH $250.00 $1,500.0 $423.50 $2,541.0 $350.00 $2,100.0 $600.87 $3,605.
<br /> 54213867 STEEL END SECTION,12 INCH 11 EACH $150.00 $1,850.0 $181.50 $1,g98.5 $200.00 $2,200.0 $450.78 $4,958.
<br /> 56400200 FIRE HYDRANTS TO BE MOVED(SPECIAL) 1 EACH $4,000.00 $4,000.0 $1,622.50 $1,622.5 $1,750.00 $1,750.0 $5,000.00 $5,000.0
<br /> 60255500 MANHOLES TO BE ADJUSTED EACH $1,405.00 $7,025.0 $1,408.00 $7,040.0 $300.00 $1,500.0 $413.16 $2,065.8
<br /> 60255501 MANHOLE CONCRETE FLAT TOP 8 INCH THICK EACH $381.20 $1,524.8 $396.00 $1,584.0 $850.00 $3,400.0 $500.08 $2,000.3
<br /> 60255800 MANHOLES TO BE ADJUSTED WITH NEW TYPE 3 FRAME AND GRATE EACH $965.00 $3.860.0 $1,815.00 $7,280.0 $1,500.00 $8,000.0 $634.82 $2,539.2
<br /> 60266600 VALVE BOXES TO BE ADJUSTED 1 EACH $863.60 $9,290.4 $682.00 $9,548.0 $200.00 $2,800.0 $200.54 $2,80�.
<br /> 60266800 VALVE BOXES TO BE REPLACED EACH $189.60 $758.4 $187.00 $748.0 $400.00 $1,600.0 $750.16 $3,000.
<br /> X4400170 COMBINATION CONCRETE CURB AND GUTTER REMOVAL AND REPLACEMENT,
<br /> TRANSIT CENTERS 3 FOOT $50.00 $1,750.0
<br /> $63.80 $2,233.0 $100.00 $3,500.0 $85.05 $2,976.7
<br /> X6710010 MOBILIZATION,2747 N SANGAMON ROAD 1 L SUM $5,000.00 $5,000.0 $1,530.00 $1,530.0 $6,500.00 $6,500.0 $7,500.00 $7,500.0
<br /> Z0000124 SOIL CEMENT MIX DESIGN AND FIELD TESTING 1 L SUM $5,300.00 $5,300.0 $3,500.00 $3,500.0 $6,000.00 $6,000.0 $3,675.00 $3,675.0
<br /> Z0000125 FINAL PROJECT REPORTS 1 L SUM $1,850.00 $1,850.0 $1,000.00 $1,000.0 $2,500.00 $2,500.0 $1,050.00 $1,050.0
<br /> Z0009000 yyORK 1 EACH $30,000.00 $30,000.0 $30,000.00 $30,000.0 $30,000.00 $30,000.0 $30,000.00 $30,000.0
<br /> TOTAL BIDS AS CORRECTED $641,639.6 $594,118.6 $636,859. $652,881.
<br /> Percent Over Under ENGINEER'S ESTIMATE -7.41% -0.74% 1.75%
<br /> .�'2�� T-Z'S-v 8
<br /> Matthew C.Nevreli,P.E.,City Engineer Date