My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2008-86 AUTHORIZING THE EXECUTION OF A PROPOSAL
COD
>
City Clerk
>
RESOLUTIONS
>
2008
>
R2008-86 AUTHORIZING THE EXECUTION OF A PROPOSAL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/22/2015 2:44:34 PM
Creation date
10/22/2015 2:44:33 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2008-86
Res Ord Title
AUTHORIZING THE EXECUTION OF A PROPOSAL FOR LAKE DECATUR MINING PLAN
Approved Date
5/19/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� 1-IC1R-iLP L. <br /> � y <br /> . 1�1�"� � �� �`� <br /> L� AS�J'a.)��1���'��,, L��� 5 N.COUNTRY CLUB ROAD 217-422-8544 <br /> CONSULTING ENGINEERS DECATUR,ILLINOIS 62521 FAX:217-422-0398 <br /> Schedule of Rates <br /> 2008 <br /> Classification Per Hour Rate Net <br /> RANGE <br /> from to <br /> En ineers <br /> Partner $170.00 - $174.00 <br /> Structural Engineer-in-Charge $100.00 - $174.00 <br /> Project Manager $71.00 - $174.00 <br /> Professional Engineer $71.00 - $121.00 <br /> Project Engineer $66.00 - $96.00 <br /> Graduate Engineer $60.00 - $77.00 <br /> Technical <br /> Senior Designer $89.00 - $98.00 <br /> Senior Engineer Technician $62.00 - $88.00 <br /> Engineer Technician $40.00 - $64.00 <br /> Construction Observation <br /> Resident Engineer $100.00 - $174.00 <br /> Senior Construction Observer $72.00 - $110.00 <br /> Construction Observer $63.00 - $71.00 <br /> Surveyors <br /> Professional Land Surveyor-in-Charge $76.00 - $132.00 <br /> Chief of Survey Party $48.00 - $81.00 <br /> Survey Instrument Operator $40.00 - $72.00 <br /> Survey Rodperson $40.00 - $62.00 <br /> Office Services and Records <br /> Accounting and Tabulation/Clerical $44.00 - $60.00 <br /> Expenses such as interim travel and subsistence, telephone and telegraph tolls,blueprints, <br /> electronic computer, subsurface investigations, laboratory testing, and subcontractor work <br /> approved by the client,will be charged at actual cost plus 10% for administration and office <br /> handling. <br /> Separate charges for Global Positioning System(GPS) survey equipment will be $42.50 per hour. <br /> The use of robotics survey equipment will be invoiced at $30.00 per hour. A Fathometer for <br /> hydrographic surveys will be invoiced at $125.00 per day. <br /> Necessary field vehicles are charged at $50.00 per day. All other mileage is charged at .505 cents <br /> per mile net�or che�Unenc rare at�owed by che i.R.s.�.Boat Service fees are $250 per day. <br /> Above quotations are subject to change with 60 days review by client, due to circumstances beyond <br /> our control. <br /> S:�Administration\Office Corres Forms Misc\Sched of Rates�2008 SOR.doc l/24/2008 <br />
The URL can be used to link to this page
Your browser does not support the video tag.