My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2008-65 ACCEPTING THE BID AND AUTHORIZING A CONTRACT
COD
>
City Clerk
>
RESOLUTIONS
>
2008
>
R2008-65 ACCEPTING THE BID AND AUTHORIZING A CONTRACT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/22/2015 4:47:56 PM
Creation date
10/22/2015 4:47:51 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2008-65
Res Ord Title
ACCEPTING THE BID AND AUTHORIZING THE EXECUTION OF A CONTRACT 300 BLOCK NORTH WATER ENHANCEMENT PROJET
Approved Date
5/19/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5130 Hickory Pant Frontage Road <br /> Suite 2 <br /> Decatur,IL 62526 • <br /> (217)875-3333 <br /> (217)875-3371 FAX � <br /> phil.pwc(o�comcast.net E-MAIL <br /> TO: Matt Newell, P.E <br /> City Engineer <br /> FROM: Phillip W.Cochran, P.E <br /> DATE 05/09/08 <br /> SUBJECT: 300 Block N Water Street <br /> Enhancement Project <br /> PWC PROJECT#: 704 <br /> CITY OF DECATUR PROJECT: 0703 <br /> As a part of my professional services to the City of Decatur for the subject project I am to assist <br /> the City in the taking of bids and prepare a recommendation for award after the bids have been reviewed. <br /> As you are aware bids were opened yesterday for the project. <br /> There w�ere a total of five bids received ranging from a low of$518,655.29 from Otto Baum to a <br /> high of$678,800.00 from Mid States. Petry-Kuhne submitted a bid and made an obvious error therefore <br /> their bid wnuld be removed from consideration. <br /> Bids w�ere received with an alternate requested for either full-depth asphalt pavement or concrete <br /> pavement. All other bid items w�ere the same;those items were bid as the Base Bid. The low bid of <br /> $518,644.29 which was submitted by Otto Baum is based on the concrete pavement alternate. <br /> I have reviewed all of the bids and am very comfortable in recommending that the City award the <br /> contract to Otto Baum Co. Inc. aocepting their bid using concrete pavement,therefore Alternate B plus <br /> the base bid which totals$518,644.29. I have discussed the aggressive project schedule with Otto <br /> " Baum's representative and was assured that the schedule would be met,assuming the Reynolds <br /> Building contractors do not interfere. We have met with the Reynolds Building General Contractor, Petry- <br /> Kuhne, and discussed our project timeline with them;they have on two occasions acknowledged that <br /> they vu�uld not coriflict with the projects schedule. Barring a nature disaster there should be no problem <br /> with Otto Baum meeting the contract documents schedule which in turn will satisfy the Ciry's Developers <br /> Agreement with the Reyndds family. <br />
The URL can be used to link to this page
Your browser does not support the video tag.