My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2008-54 AUTHORIZING AGREEMENT
COD
>
City Clerk
>
RESOLUTIONS
>
2008
>
R2008-54 AUTHORIZING AGREEMENT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/23/2015 9:43:33 AM
Creation date
10/23/2015 9:43:29 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2008-54
Res Ord Title
AUTHORIZING AGREEMENT EASTERN ILLINOIS UNIVERSITY BOARD OF TRUSTEES - GEOGRAPHIC INFORMATION SYSTEM TECHNICAL MAPPING SERVICES
Approved Date
4/21/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� � <br /> one. Revisions will commence immediately and final revised copies will be submitted <br /> to Engineering and Infrastructure for acceptance. <br /> All data compiled by GISci Lab Professionals will be directed to the Project <br /> Manager for processing, amalgamation, quality assurance / quality control, and input <br /> into the Sewer -Storm Water and Water Utilities Geodatabase Models. <br /> Note: AlI data will be stored in a scalable and expandable ESRI Personal <br /> Geodatabase Format (MS Access) with full attribute and spatial domains on <br /> p�edefined fields using an existing ESRI Water Utilities Model with supplemental <br /> attribute domains built upon select fields. Customization of these domains is <br /> absolutely necessary to reflect existing coded and range values used by the City of <br /> Decatur Fire Department and the City of Decatur. <br /> All data will be delivered in an ESRI Personal GIS database (MS Access) <br /> format on CD or DVD format as necessary unless specified otherwise. During <br /> acquisition of utilities, basic ArcGIS Server services will be provided at no additional <br /> cost such that City of Decatur staff may monitor network construction as it <br /> progresses. <br /> Cost: <br /> Phase two Implementation of Sewer -Storm Water Utility and Water Main <br /> Utility, turn-key system $96,000. <br />
The URL can be used to link to this page
Your browser does not support the video tag.