My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2008-15 AUTHORIZING UNDERPASS PAINTING AND SIDEWALK CANOPY AGREEMENT
COD
>
City Clerk
>
RESOLUTIONS
>
2008
>
R2008-15 AUTHORIZING UNDERPASS PAINTING AND SIDEWALK CANOPY AGREEMENT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/23/2015 11:48:46 AM
Creation date
10/23/2015 11:48:43 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2008-15
Res Ord Title
AUTHORIZING UNDERPASS PAINTING AND SIDEWALK CANOPY AGREEMENT WITH NORFOLK SOUTHERN RAILWAY COMPANY - WEST MAIN / MILLIKIN STREETSCAPE IMPROVEMENT PROJECT
Approved Date
2/4/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
k F <br /> . rt � , <br /> work within Railroad right-of-way, or before placing any obstruction <br /> over any track, the Contractor shall: <br /> 1. Notify the Railroad's representative at least 72 hours in <br /> advance of the work. <br /> 2. Receive assurance from the Railroad's representative that <br /> arrangements have been made for flagging service as may be <br /> necessary. <br /> 3. Receive permission from the Railroad's representative to <br /> proceed with the work. <br /> 4. Ascertain that the Engineer has received copies of notice to <br /> The Railroad and of the Railroad's response thereto. <br /> 5. CONSTRUCTION PROCEDURES: <br /> A. General: <br /> Construction work and operations by the Contractor on Railroad <br /> property shall be: ', <br /> 1. Subject to the inspection and approval of the Railroad. <br /> 2. In accord with all of the Railroad's written speci�c conditions. <br /> 3. In accord with the Railroad's general rules, regulations and <br /> requirements including those relating to safety, fall protection <br /> and personal protective equipment. <br /> 4. In accord with these Special Provisions. <br /> B. Excavation• <br /> The subgrade of an operated track shall be maintained with edge of <br /> beam at least 14'-0" from centerline of track and not more than 24- <br /> inches below top of rail. Contractor will not be required to make <br /> existing section meet this speci�cation if substandard, in which case <br /> existing section will be maintained. <br /> C. Excavation for Structures: <br /> The Contractor will be required to take special precaution and care <br /> in connection with excavating and shoring pits, and in driving piles <br /> or sheeting for footings adjacent to tracks to provide adequate <br /> lateral support for the tracks and the loads which they carry, <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.