i � <br /> � � � , <br /> 7. All erection or demolition plans, procedures, data sheets, etc. <br /> submitted must be prepared, signed and sealed by a <br /> Registered Professional Engineer. <br /> 8. The Railroad's representative must be present at the site <br /> during the entire demolition and erection procedure period. <br /> 9. All procedures, plans and calculations shall �rst be approved <br /> by the Engineer and the Railroad Engineer, but such approval <br /> does not relieve the Contractor from liability. <br /> E. Blastin�: <br /> 1. The Contractor shall obtain advance approval of the Railroad I <br /> Engineer and the Engineer for use of explosives on or adjacent , <br /> to Railroad property. The request for permission to use <br /> egplosives shall include a detailed blasting plan. If permission <br /> for use of explosives is granted, the Contractor will be <br /> required to comply with the following: <br /> (a) Blasting shall be done with light charges under the <br /> direct supervision of a responsible officer or employee <br /> of the Contractor and a licensed blaster. <br /> (b) Electric detonating fuses shall not be used because of <br /> the possibility of premature explosions resulting from <br /> operation of two-way radios. <br /> (c) No blasting shall be done without the presence of an <br /> authorized representative of the Railroad. At least 72 <br /> hours advance notice to the person designated in the <br /> Railroad's notice of authorization to proceed (see <br /> paragraph 2B) will be required to arrange for the <br /> presence of an authorized Railroad representative and <br /> such flagging as the Railroad may require. <br /> (d) Have at the job site adequate equipment, labor and <br /> materials and allow sufficient time to clean up debris <br /> resulting from the blasting without delay to trains, as <br /> well as correcting at his expense any track <br /> misalignment or other damage to Railroad property <br /> resulting from the blasting as directed by the Railway's <br /> authorized representative. If his actions result in delay <br /> of trains, the Contractor shall bear the entire cost <br /> thereof. <br /> 5 <br />