Laserfiche WebLink
i e �I <br /> � _ i , I� <br /> 2. The Railroad representative will: I <br /> (a) Advise the Contractor of the amount of track time ', <br /> available for the blasting operation and clean up. , <br /> (b) Have the authority to order discontinuance of blasting I <br /> if, in his opinion, blasting is too hazardous or is not in ', <br /> accord with these special provisions. <br /> F. Maintenance of Railroad Facilities: I�� <br /> 1. The Contractor will be required to maintain all ditches and <br /> drainage structures free of silt or other obstructions that may <br /> result from construction operations and provide and maintain I <br /> any erosion control measures as required. The Contractor � <br /> will promptly repair eroded areas within Railroad rights-of- <br /> way and repair any other damage to the property of the <br /> Railroad or its tenants. <br /> 2. All such maintenance and repair of damages due to the <br /> Contractor's operations shall be done at the Contractor's <br /> expense. <br /> G. Storage of Materials and Eauipment: <br /> Materials and equipment shall not be stored where they will <br /> interfere with Railroad operations, nor on the rights-of-way of the <br /> Railroad Company without first having obtained permission from <br /> the Railroad Engineer, and such permission will be with the <br /> understanding that the Railroad Company will not be liable for <br /> damage to such material and equipment from any cause and that the <br /> Railroad Engineer may move or require the Contractor to move, at <br /> the Contractor's expense, such material and equipment. <br /> All grading or construction machinery that is left parked near the <br /> track unattended by a watchman shall be effectively immobilized so <br /> that it cannot be moved by unauthorized persons. The Contractor <br /> shall protect, defend, indemnify and save Railroad, and any <br /> associated, controlled or affiliated corporation, harmless from and <br /> against all losses, costs, expenses, claim or liability for loss or <br /> damage to property or the loss of life or personal injury, arising out <br /> of or incident to the Contractor's failure to immobilize grading or <br /> construction machinery. <br /> 6 <br />