My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2007-186 AUTHORIZING CHANGE ORDER
COD
>
City Clerk
>
RESOLUTIONS
>
2007
>
R2007-186 AUTHORIZING CHANGE ORDER
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/30/2015 10:15:32 AM
Creation date
10/30/2015 10:15:32 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2007-186
Res Ord Title
AUTHORIZING CHANGE ORDER GREEN STREET WATER MAIN REPLACEMENT
Approved Date
10/1/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. � <br /> Engineering & Infrastructure Memorandum <br /> NO. 2007-60 <br /> September 24, 2007 <br /> TO: Honorable Mayor Osborne and City Council <br /> � <br /> FROM: Steve Garm ity Manager � ///,/. <br /> Richard G. rley, P.E.,Director of Engineering In rastructur ��`r� <br /> SUBJECT: Green Street Water Main Replacement Change Order <br /> City Project 06-10 <br /> SUMMARY RECOMMENDATION: <br /> It is recommended that City Council approve the attached resolution authorizing a change order <br /> to Bodine Services of Decatur in the amount of$48,109.72 on the Green Street Water Main <br /> Replacement Project (Monroe to Van Dyke, City Project No. 06-10). Approval of the change <br /> order is necessary to pay costs for work of an emergency nature on the water main replacement <br /> project. The total completed project cost is $711,534.72. Construction on the project is <br /> complete, all quantities have been measured and final costs computed. <br /> BACKGROUND: <br /> On October 2, 2006, the City Council authorized a contract in the amount of$498,425 with <br /> Bodine Services of Decatur to replace the water line in Green Street between Monroe Street and <br /> Main Street. On April 16, 2007, the City Council approved a change order in the amount of <br /> $165,000 adding a second phase of work to replace the water main in Green Street west of <br /> Monroe Street to Van Dyke Street. The total amount of the contract approved by Council for <br /> both first and second phases of the work is $663,425. <br /> The second phase of the Green Street water main replacement project experienced an unusually <br /> large amount of unplanned work. The extra work included both emergency and non-emergency <br /> items. Construction work may be considered of an emergency nature when it meets one of two <br /> criteria: <br /> 1. Purchase of materials or services that are crucial to avoiding prolonged downtime or <br /> unnecessary lengthening of a task or job. <br /> 2. Purchase of materials or services that are made to protect public health, safety and <br /> welfare due to an event that has occurred or is expected to occur soon. <br /> On the Green Street proj ect, emergency purchases included replacements of failed water service <br /> lines, extra work resulting from conflicts with abandoned utility lines not previously known and <br /> extra work to identify the vertical elevation of known utility lines to avoid conflicts with the <br /> water main. On phase 2 of the Green Street Water Main replacement project, the total amount of <br /> emergency purchases is $62,322.67. <br />
The URL can be used to link to this page
Your browser does not support the video tag.