My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2007-149 AUTHORIZING AGREEMENT DIXON ENGINEERING, INC.
COD
>
City Clerk
>
RESOLUTIONS
>
2007
>
R2007-149 AUTHORIZING AGREEMENT DIXON ENGINEERING, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/30/2015 1:37:56 PM
Creation date
10/30/2015 1:37:55 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2007-149
Res Ord Title
AUTHORIZING AGREEMENT DIXON ENGINEERING, INC. MAINTENANCE INSPECTION OF DIVISION STREET TANK AND GARFIELD AVENUE TANK
Approved Date
8/6/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 l. Furnish pressure relief valves to the Owner for use on the distribution system two <br /> (2)days prior to the inspection. The Owner is to return the valves to DIXON <br /> within one week of the inspection. The purpose of these valves is to waste water <br /> to prevent excess pressures in the line.The Owner is cautioned to inspect these <br /> valves prior to their installation as they are provided to many clients with different <br /> water supplies and different water constituents. Several times these valves are <br /> shipped from one client to another;therefore,the valve must be adjusted and <br /> checked for sticking by the Owner prior to each use. The Owner should be aware <br /> that the valves are a safeguard but they are not failsafe. The Owner should pay <br /> special attention to excess pressures in zones where he anticipates problems, such <br /> as older pipes. Valves can be sent up to a week or two in advance at the Owner's <br /> reques� <br /> DIVE OPTION: <br /> I Scope of Services Performed by Owner: <br /> 1. Perform chlorine residuals and bacteriological testing after completion of the <br /> inspection. <br /> 2. Fill the tank to overflow or higher capacity,and isolate it from the system during <br /> the dive inspection. <br /> II Scope of Services Performed by Professional: <br /> 1. Inspect the tank's interior coating and appurtenances by diving. <br /> 2. Complete a11 services listed above under inspection. <br /> 3. Complete all work per AWWA C652 standards and OSHA requirements for <br /> confined space. <br /> -4- <br />
The URL can be used to link to this page
Your browser does not support the video tag.