My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2007-149 AUTHORIZING AGREEMENT DIXON ENGINEERING, INC.
COD
>
City Clerk
>
RESOLUTIONS
>
2007
>
R2007-149 AUTHORIZING AGREEMENT DIXON ENGINEERING, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/30/2015 1:37:56 PM
Creation date
10/30/2015 1:37:55 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2007-149
Res Ord Title
AUTHORIZING AGREEMENT DIXON ENGINEERING, INC. MAINTENANCE INSPECTION OF DIVISION STREET TANK AND GARFIELD AVENUE TANK
Approved Date
8/6/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
II Scope of Services Performed by DIXON: <br /> 1. Clean interior surfaces of the tank with high pressure water. Cleaning is <br /> necessary for the Professional to be able to remove all the mud This allows <br /> DIXON the ability to see any deterioration of the steel,pitting, etc. High pressure <br /> water also enables DIXON to perForm a very low cost adhesion test on the <br /> remaining coating. DIXON would notice if the coating is wavering,etc.,which <br /> would indicate very poor adhesion and anticipated failure. The amount of mud � <br /> removed from a torus tank depends upon the Owner's preference,time allotted, � <br /> and cleaning equipment available. ' <br /> 2. Inspect the tank's interior coating for remaining intactness and anticipated life. I <br /> Review all interior girders and appurtenances for possible structural damage from <br /> icing or corrosion. <br /> 3. Review all interior surfaces for conosion and/or damage,and qualify damage for <br /> repairs. All repairs are to be quantified by e�rapolation of a measured area. All <br /> quantities are estimates(usually high)because conosion will continue between <br /> inspection and repair. <br /> 4. Inspect the exterior coating and perform cross-cut ad.hesion tests where coating <br /> adhesion is questionable. If it is evident that repainting is not necessary for <br /> several years,no destructive adhesion tests will be performed <br /> 5. Review all exterior appurtenances for damage due to corrosion. <br /> 6. Review a11 safety requirements for ladders,cages, etc. (interior and exterior). <br /> 7. Review all health aspects of the tank, including screening of the vent, overflow <br /> pipe,and other possible contamination sources. <br /> 8. Review the exteriar of the exposed foundations. <br /> 9. Prepare a report documenting all items found and recommendations for repair, <br /> including budgetary items. The engineering report is to include: Conclusions and <br /> recommendations,base report,digital photographs,and descriptions. <br /> 10. Chlorinate the tank per AWWA Method Na. 3 C-652-02. This item may be <br /> relocated to the Scope of Services Performed by Owner, if thus contracted. <br /> -3 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.