Laserfiche WebLink
, <br /> �' ` ;� <br /> � LOCaI AgenCy State Contract Day Labor Local Contract RR Force Account <br /> �l IIII1101S D@��'�711PJ1t <br /> `� of TranSpOrtafiOn City of Decatur x <br /> Local Agency Agreement section Fund Type ITEP Number <br /> for Federal Participation 09-00702-00-BR BRP <br /> Construction En ineerin Ri ht-of-Wa <br /> Job Number Project Number Job Number Project Number Job Number Project Number <br /> C-97-062-07 BHM-5169(37) <br /> This Agreement is made and entered into between the above local agency hereinafter referred to as the"LA"and the state of Illinois,acting <br /> by and through its Department of Transportation, hereinafter referred to as"STATE". The STATE and LA jointly propose to improve the <br /> designated location as described below. The improvement shall be constructed in accordance with plans approved by the STATE and the <br /> STATE's policies and procedures approved and/or required by the Federal Highway Administration hereinafter referred to as"FHWA". <br /> Location , <br /> Local Name Mound Road Route FAU 7359 Length 300 feet <br /> Termini over Stevens Creek on the North side of Decatur <br /> Current Jurisdiction City of Decatur Existing Str. No 058-3062 <br /> Project Description <br /> Deck replacement and other work as necessary to compiete the section <br /> Division of Cost <br /> Type of Work BRP % STATE % LA % Total <br /> Participating Construction 472,000 ( 80 ) ( ) 118,000 ( 20 ) 590,000 <br /> Non-Participating Construction ( ) ( ) ( ) <br /> Preliminary Engineering ( ) ( ) ( ) <br /> Construction Engineering ( ) ( ) ( ) <br /> Right of Way ( ) ( ) ( ) <br /> Railroads ( ) ( ) ( ) <br /> Utilities ( ) ( ) ( ) <br /> TOTAL $ 472,000 $ $ 118,000 $ 590,000 <br /> NOTE: The costs shown in the Division of Cost table are approximate and subject to change. The final LA share is dependent on the final Federal and <br /> State participation. The actual costs will be used in the final division of cost for billing and reimbursment. <br /> If funding is not a percentage of the total,place an asterisk in the space provided for the percentage and explain above. <br /> The Federal share of construction engineering may not exceed 15%of the Federal share of the final construction cost. <br /> Local Agency Appropriation <br /> By execution of this Agreement,the LA is indicating sufficient funds have been set aside to cover the local share of the project cost and <br /> additional funds will be appropriated, if required,to cover the LA's total cost. <br /> Method of Financing(State Contract Work) <br /> METHOD A---Lump Sum (95%of LA Obligation) <br /> METHOD B--- Monthly Payments of <br /> METHOD C---LA's Share $118,000.00 divided by estimated total cost multiplied by actual proqress payment. <br /> (See page two for details of the above methods and the financing of Day Labor and Local Contracts) <br /> Page 1 of 4 BLR 05310(Rev.2/06) <br /> Printed on 4/11/2007 11:33:24 AM <br />