My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2007-98 AUTHORIZING THE EXECUTION OF SUPPLEMENTAL AGREEMENT NO. 1
COD
>
City Clerk
>
RESOLUTIONS
>
2007
>
R2007-98 AUTHORIZING THE EXECUTION OF SUPPLEMENTAL AGREEMENT NO. 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/30/2015 4:07:55 PM
Creation date
10/30/2015 4:07:55 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2007-98
Res Ord Title
AUTHORIZING THE EXECUTION OF SUPPLEMENTAL AGREEMENT NO. 1 WATER SYSTEM IMPROVEMENTS - PHASE II
Approved Date
6/4/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
, <br /> �+ ._ - <br /> STRAND <br /> ASSOCIATES, INC.� <br /> E N G I N E E R S � <br /> 910 West Wingra Drive <br /> Madison,WI 53715 <br /> Phone:608-251-4843 May 22� 2,��7 <br /> F�:608-251 8655 <br /> Office Locations <br /> City of Decatur � <br /> Madison,wi #1 Gary K. Anderson Plaza <br /> Joliet, IL <br /> Louisville, �v Decatur, IL 62523-1196 <br /> Lexington,KY <br /> Mobile,AL <br /> Columbus,w Re: Amendment No. 1 to the August 23, 2006, Engineering Services Agreement <br /> Lancaster,OH Water S stem Im rovements—Phase II <br /> �ndianapolis,�N Y p <br /> Milwaukee,WI <br /> Cincinnati,OH <br /> Attention: Mr. Keith D. Alexander, Director of Water Management <br /> www.strand.com <br /> This is Amendment No. 1 to the referenced Agreement. <br /> In the first sentence of the first paragraph on page 1, after the word Design, ADD the words <br /> "and Construction-Related." <br /> Under Scope of Services page 1, ADD the word"Design"prior to the word Scope. <br /> Under Scope of Services,ADD the following section after item 39. <br /> "The Construction-Related Services shall include the following tasks: <br /> 1. Conduct a preconstruction conference at the site. An agenda will be provided for the <br /> conference and meeting minutes prepared and distributed. <br /> 2. Review Contractor's shop drawing submittals, answer questions from the <br /> Contractor, and review Contractor's periodic pay requests. <br /> 3. Prepare Change Orders and review proposals, if necessary. <br /> 4. Conduct monthly construction progress meetings and make periodic site visits <br /> throughout construction. <br /> 5. Provide a part-time resident project representative (RPR) for observation of <br /> construction. In furnishing observation services, ENGINEER's efforts shall be <br /> directed toward determining for OWNER that the completed PROJECT will, in <br /> general, conform to the Contract Documents; but ENGINEER shall not supervise, <br /> direct, or have control over the Contractor's work and shall not be responsible for <br /> the Contractor's construction means, methods, techniques, sequences, procedures, or <br /> health and safety precautions or programs, or for the Contractor's failure to perform <br /> the construction work in accordance with the Contract Documents. <br />
The URL can be used to link to this page
Your browser does not support the video tag.