My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2007-98 AUTHORIZING THE EXECUTION OF SUPPLEMENTAL AGREEMENT NO. 1
COD
>
City Clerk
>
RESOLUTIONS
>
2007
>
R2007-98 AUTHORIZING THE EXECUTION OF SUPPLEMENTAL AGREEMENT NO. 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/30/2015 4:07:55 PM
Creation date
10/30/2015 4:07:55 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2007-98
Res Ord Title
AUTHORIZING THE EXECUTION OF SUPPLEMENTAL AGREEMENT NO. 1 WATER SYSTEM IMPROVEMENTS - PHASE II
Approved Date
6/4/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Keith D. Alexander <br /> City of Decatur <br /> STRAND Page 2 <br /> ASSOCIATES, INC" Ma�J GG GOO/ <br /> E N G I N E E R S J � <br /> 6. Provide a functional testing check list for approval by OWNER prior to start-up and <br /> functional testing. <br /> 7. Conduct site visits for start-up and functional testing of the new equipment and <br /> SCADA System additions. <br /> 8. Conduct a final inspection with OWNER and Contractor and prepare a punch-list of <br /> those items to be completed or corrected before final completion of the PROJECT. <br /> 9. Conduct a final walk-through with OWNER to determine if the punch list is <br /> completed. <br /> 10. Collect and organize three sets of operation and maintenance data submitted by the <br /> Contractor. Each set will be placed in separate three ring binders, the binders <br /> indexed, and a table of contents provided. Binders will be transmitted to OWNER. <br /> 11. Prepare and submit to OWNER record drawings consisting of one set of drawings in <br /> PDF format and one set of drawings in AutoCAD format. Each set of drawings will <br /> be provided on a compact disk. Record drawings will be prepared from field <br /> measurements and markups furnished by the construction Contractor. ENGINEER <br /> shall not be responsible for the accuracy of the data supplied by others. The <br /> Contractor's marked-up drawings will also be transmitted to the OWNER. <br /> 12. Conduct a warranty inspection with the OWNER and Contractor just prior to <br /> expiration of the one year warranty period." <br /> Under Service Elements Not Included, DELETE item 4. <br /> Under Compensation, CHANGE the following: <br /> ADD the word"Design"prior to the word Scope in the first paragraph. <br /> Under Compensation, ADD after the first paragraph "OWNER shall compensate <br /> ENGINEER for Construction-Related Services on an hourly basis plus expenses for a <br /> limiting fee of$145,000." <br /> Under Changes, CHANGE the second sentence of item 2 to read as follows: "The lump <br /> sum fee and the limiting fee shall not be exceeded without prior notice to and agreement by <br /> OWNER but may be adjusted for time delays, time extensions, amendments, and changes in <br /> the scope of services." <br /> SPZ:U�R:�Documents�Agreements�Decatur\Wtr.Sys.Imprvnuit.2004-2006�Amd\1-624-004.Ptiase II Amend l.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.