Work, as well as the information furnished by the Owner pursuant to Section 22.3,shall take field measurements of <br /> any eacisting conditions related to tha[portion of the Work and shall observe any conditions at the site affecting it. <br /> These obligations are for the purpose of facilitating construction by the Contractor and are not for the purpose of <br /> discovering errors,omissions, or inconsistencies in the Contract Documents;however,any errors,inconsistencies or <br /> omissions discovered by the Contractor shall be repoRed promptly to the Architect as a request for information in <br /> such form as the Architect may require. <br /> §3.2.2 Any design errors or omissions noted by the Contractor during this review shall be reported promptly to the <br /> Architect,but it is recognized that the Contractor's review is made in the Contractor's capacity as a contractor and <br /> not as a licensed design professional unless otherwise specifically provided in the Contract Documents.The <br /> Contractor is not required to ascertain that the Contract Documents are in accordance with applicable laws,statutes, <br /> ordinances,building codes, and rules and regulations,but any nonconformity discovered by or made known to the <br /> Contractor shall be reported promptly to the Architect. <br /> §3.2.3 If the Contractor believes that additional cost or time is involved because of clarifications or instructions <br /> issued by the Architect in response to the Contractor's notices or requests for information pursuant to Sections 3.2.1 <br /> and 3.2.2, the Contractor shall make Claims as provided in Sections 4.3.6 and 4.3.7.If the Contractor fails to <br /> perform the obligations of Sections 3.2.1 and 3.2.2, the Contractor shall pay such costs and damages to the Owner as <br /> would have been avoided if the Contractor had performed such obligations.The Contractor shall not be liable to the <br /> Owner or Architect for damages resulting from errors,inconsistencies or omissions in the Contract Documents or <br /> for differences between field measurements or conditions and the Contract Documents unless the Contractor <br />' recognized such error,inconsistency,omission or difference and knowingly failed to report it to the Architect. <br /> §3.3 SUPERVISION AND CONSTRUCTION PROCEDURES <br /> §3.3.1 The Contractor shall supervise and direct the Work,using the Contractor's best skill and attention.The <br /> Contractor shall be solely responsible for and have control over construction means,methods,techniques,sequences <br /> and procedures and for coordinating all portions of the Work under the Contract,unless the Contract Documents <br /> give other specific instructions concerning these matters.If the Contract Documents give specific instructions <br /> concerning construction means, methods,techniques, sequences or procedures,the Contractor shall evaluate the <br /> jobsite safety thereof and,except as stated below,shall be fully and solely responsible for the jobsite safety of such <br /> means,methods,techniques,sequences or procedures.If the Contractor determines that such means, methods, <br /> techniques, sequences or procedures may not be safe, the Contractor shall give timely written notice to the Owner <br /> and Architect and shall not proceed with that portion of the Work without further written instructions from the <br /> Architect. If the Contractor is then instructed to proceed with the required means, methods,techniques,sequences or <br /> procedures without acceptance of changes proposed by the Contractor,the Owner shall be solely responsible for any <br /> resulting loss or damage. <br /> §3.3.2 The Contractor shall be responsible to the Owner for acts and omissions of the Contractor's employees, <br /> Subcontractors and their agents and employees,and other persons or entities performing portions of the Work for or <br /> on behalf of the Contractor or any of its Subcontractors. <br /> §3.3.3 The Contractor shall be responsible for inspection of portions of Work already performed to determine that <br /> such portions are in proper condition to receive subsequent Work. <br /> §3.4 LABOR AND MATERIALS <br /> §3.4.1 Unless otherwise provided in the Contract Documents,the Contractor shall provide and pay for labor, <br /> materials,equipment,tools,construction equipment and machinery,water,heat,utilities,transportation,and other <br /> facilities and services necessary for proper execution and completion of the Work, whether temporary or permanent <br /> and whether or not incorporated or to be incorporated in the Work. <br /> §3.4.2 The Contractor may make substitutions only with the consent of the Owner, after evaluation by the Architect <br /> and in accordance with a Change Order. <br /> 3.4.2.1 After the Contract has been executed,the Owner and the Architect will consider a formal request for the <br /> substitution of products in place of those specified only under the conditions set forth in the General <br /> Requirements(Division 1 of the Specifications). <br /> AIA Document A201TM—1997.Copyright OO 1911,1915,1918,1925,1937,1951,1958,1961,1963,1966,1970,1976,1987 and 1997 by The American <br /> Institute of Architects. All rights reserved. WARNING:This AIA� Document is protected by U.S.Copyright Law and International Treaties. �3 <br /> Unauthorized reproduction or distribution of this AIA�Document,or any portion of it,may result in severe civil and criminal penalties,and will be <br /> prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 16:16:56 on 03/13/2007 under Order <br /> No.UNLICENSED which expires on 11/18/2007,and is not for resale. <br /> User Notes: (2584627897) <br />