continuation of the Work.After such evidence has been furnished,the Owner shall not materially vary such <br /> financial arrangements without prior notice to the Contractor. <br /> §2.2.2 Except for permits and fees,including those required under Section 3.7.1,which are the responsibility of the <br /> Contractor under the Contract Documents, the Owner shall secure and pay for necessary approvals,easements, <br /> assessments and charges required for construction,use or occupancy of permanent structures or for permanent <br /> changes in existing facilities. <br /> §2.2.3 The Owner shall furnish surveys describing physical characteristics,legal limitations and utility locations for <br /> the site of the Project,and a legal description of the site.The Contractor shall be entitled to rely on the accuracy of <br /> information furnished by the Owner but shall exercise proper precautions relating to the safe performance of the <br /> Work. <br /> §2.2.4 Information or services required of the Owner by the Contract Documents shall be furnished by the Owner <br /> with reasonable promptness.Any other information or services relevant to the Contractor's performance of the ' <br /> Work under the Owner's control shall be furnished by the Owner after receipt from the Contractor of a written I <br /> request for such information or services. <br /> I §2.2.5 The Contractor will be furnished free of charge ten(10)copies of Drawing and Project Manuals. Additional <br /> sets will be furnished at the cost of reproduction,postage and handling. <br /> §2.3 OWNER'S RIGHT TO STOP THE WORK <br /> §2.3.1 If the Contractor fails to correct Work which is not in accordance with the requirements of the Contract <br /> Documents as required by Section 12.2 or persistently fails to carry out Work in accordance with the Contract <br /> Documents,the Owner may issue a written order to the Contractor to stop the Work,or any portion thereof,until the <br /> cause for such order has been eliminated;however,the right of the Owner to stop the Work shall not give rise to a <br /> duty on the paR of the Owner to exercise this right for the benefit of the Contractor or any other person or e�tity, <br /> except to the extent required by Section 6.1.3. <br /> §2.4 OWNER'S RIGHT TO CARRY OUT THE WORK <br /> §2.4.1 If the Contractor defaults or neglects to cany out the Work in accordance with the Contract Documents and <br /> fails within a seven-day period after receipt of written notice from the Owner to commence and continue correction <br /> of such default or neglect with diligence and promptness,the Owner may after such seven-day period give the <br /> Contractor a second written notice to correct such deficiencies within a three-day period.If the Contractor within <br /> such three-day period after receipt of such second notice fails to commence and continue to conect any deficiencies, <br /> the Owner may,without prejudice to other remedies the Owner may have,correct such deficiencies. In such case an <br /> appropriate Change Order shall be issued deducting from payments then or thereafter due the Contractor the <br /> reasonable cost of correcting such deficiencies,including Owner's expenses and compensation for the ArchitecYs <br /> additional services made necessary by such default,neglect or failure. Such action by the Owner and amounts <br /> charged to the Contractor are both subject to prior approval of the Architect.If payments then or thereafter due the <br /> Contractor are not sufficient to cover such amounts,the Contractor shall pay the difference to the Owner. <br /> ARTICLE 3 CONTRACTOR <br /> §3.1 GENERAL <br /> §3.1.1 The Contractor is the person or entity identified as such in the Agreement and is referred to throughout the <br /> Contract Documents as if singular in number.The term"Contractor" means the Contractor or the Contractor's <br /> authorized representative. <br /> §3.1.2 The Contractor shall perform the Work in accordance with the Contract Documents. <br /> §3.1.3 The Contractor shall not be relieved of obligations to perform the Work in accordance with the Contract <br /> Documents either by activities or duties of the Architect in the Architect's administration of the Contract,or by tests, <br /> inspections or approvals required or performed by persons other than the Contractor. <br /> §3.2 REVIEW OF CONTRACT DOCUMENTS AND FIELD CONDITIONS BY CONTRACTOR <br /> §3.2.1 Since the Contract Documents are complementary,before starting each portion of the Work,the Contractor <br /> shall carefully study and compare the various Drawings and other Contract Documents relative to that portion of the <br /> AIA Document A201n"—1997.Copyright �O 1911,1915,1918,1925,1937,1951,1958,1961,1963,1966,1970,1976,1987 and 1997 by The American <br /> Institute of Architects. All rights reserved. WARNING:This AIA� Document is protected by U.S.Copyright Law and International Treaties. �2 <br /> Unauthorized reproduction or distribution of this AIA�'Document,or any portion of it,may result in severe civil and criminal penalties,and will be <br /> prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 16:16:56 on 03/13/2007 under Order <br /> No.UNLICENSED which expires on 11/18/2007,and is not for resale. <br /> User Notes: (2584627897) <br />