Laserfiche WebLink
the Contract Documents.Submittals which are not required by the Contract Documents may be returned by the <br /> Architect without action. <br /> §3.12.5 The Contractor shall review for compliance with the Contract Documents, approve and submit to the <br /> Architect Shop Drawings,Product Data,Samples and similar submittals required by the Contract Documents with <br /> reasonable promptness and in such sequence as to cause no delay in the Work or in the activities of the Owner or of <br /> separate contractors.Submittals which are not marked as reviewed for compliance with the Contract Documents and <br /> approved by the Contractor may be returned by the Architect without action. <br /> §3.12.6 By approving and submitting Shop Drawings,Product Data, Samples and similar submittals,the Contractor <br /> represents that the Contractor has determined and verified materials,field measurements and field construction <br /> criteria related thereto, or will do so,and has checked and coordinated the information contained within such <br /> submittals with the requirements of the Work and of the Contract Documents. <br /> §3.12.7 The Contractor shall perform no portion of the Work for which the Contract Documents require submittal <br /> and review of Shop Drawings,Product Data, Samples or similar submittals until the respective submittal has been <br /> approved by the Architect. <br /> §3.12.8 The Work shall be in accordance with approved submittals except that the Contractor shall not be relieved of <br /> responsibility for deviations from requirements of the Contract Documents by the Architect's approval of Shop <br /> Drawings,Product Data,Samples or similar submittals unless the Contractor has specifically informed the Architect <br /> in writing of such deviation at the time of submittal and(1)the Architect has given written approval to the specific <br /> deviation as a minor change in the Work,or(2)a Change Order or Construction Change Directive has been issued <br /> authorizing the deviation.The Contractor shall not be relieved of responsibility for errors or omissions in Shop <br /> Drawings,Product Data,Samples or similar submittals by the Architect's approval thereof. <br /> §3.12.9 The Contractor shall direct specific attention,in writing or on resubmitted Shop Drawings,Product Data, ', <br /> Samples or similar submittals,to revisions other than those requested by the Architect on previous submittals.In the <br /> absence of such written notice the Architect's approval of a resubmission shall not apply to such revisions. <br /> §3.12.10 The Contractor shall not be required to provide professional services which constitute the practice of <br /> architecture or engineering unless such services are specifically required by the Contract Documents for a portion of <br /> the Work or unless the Contractor needs to provide such services in order to carry out the Contractor's <br /> responsibilities for construction means,methods,techniques, sequences and procedures.The Contractor shall not be <br /> required to provide professional services in violation of applicable law. If professional design services or <br /> certifications by a design professional related to systems,materials or equipment are specifically required of the <br /> Contractor by the Contract Documents,the Owner and the Architect will specify all performance and design criteria <br /> that such services must satisfy.The Contractor shall cause such services or certifications to be provided by a ' <br /> properly licensed design professional, whose signature and seal shall appear on all drawings,calculations, <br /> specifications,certifications,Shop Drawings and other submittals prepared by such professional. Shop Drawings <br /> and other submittals related to the Work designed or certified by such professional,if prepared by others,shall bear <br /> such professional's written approval when submitted to the Architect.The Owner and the Architect shall be entitled <br /> to rely upon the adequacy,accuracy and completeness of the services,certifications or approvals performed by such <br /> design professionals,provided the Owner and Architect have specified to the Contractor all performance and design <br /> criteria that such services must satisfy.Pursuant to this Section 3.12.10,the Architect will review,approve or take <br /> other appropriate action on submittals only for the limited purpose of checking for conformance with information <br /> given and the design concept expressed in the Contract Documents.The Contractor shall not be responsible for the <br /> adequacy of the performance or design criteria required by the Contract Documents. <br /> §3.13 USE OF SITE <br /> §3.13.1 The Contractor shall confine operations at the site to areas permitted by law,ordinances,permits and the <br /> Contract Documents and shall not unreasonably encumber the site with materials or equipment. <br /> §3.14 CUTTING AND PATCHING <br /> §3.14.1 The Contractor shall be responsible for cutting, fitting or patching required to complete the Work or to make <br /> its parts fit together properly. <br /> AIA Document A201 TM—1997.Copyright O 191 1,1915,1918,1925,1937,1951,1958,1961,1963,1966,1970,1976,1987 and 1997 by The American <br /> Institute of Architects. All rlghts reserved. WARNING:This AIA� Document is protected by U.S.Copyright Law and International Treaties. �s <br /> Unauthorized reproduction or distribution of this AIA�Document,or any portion of it,may result in severe civil and criminal penalties,and will be <br /> prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 16:16:56 on 03/13/2007 under Order <br /> No.UNLICENSED which expires on 11/18/2007,and is not for resale. <br /> User Notes: (2584627897) <br />