My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2007-05 ACCEPTING THE BID AND AUTHORIZING A CONTRACT
COD
>
City Clerk
>
RESOLUTIONS
>
2007
>
R2007-05 ACCEPTING THE BID AND AUTHORIZING A CONTRACT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2015 11:05:15 AM
Creation date
11/2/2015 11:05:14 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2007-05
Res Ord Title
ACCEPTING THE BID AND AUTHORIZING THE EXECUTION OF A CONTRACT 2006 SANITARY SEWER TRENCHLESS POINT REPAIRS
Approved Date
1/8/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. � <br /> Project Name: 2006 SANITARY SEWER TRENCHLESS POINT REPAIRS <br /> Engineer's Estimate Bodine Environmental National Power <br /> Project Number: 06-29 Services,Inc. Rodding Corp. <br /> 5350 E.Firehouse Road 2500 W.Arthington Street <br /> City Engineering Division Decatur,IL 62521 Chicago,IL 60612-4108 <br /> Bid Date: WEDNESDAY,DECEMBER 20,2006 <br /> Time: 10:05 A.M. <br /> Fund: SEWER FUND <br />� Organization Code: <br /> Object Code: <br /> Item pay Item QTY Unit Unit Price Totai Unit Price Total Unit Price Total <br /> Number <br /> 1 CURED IN-PLACE SPOT LINING,8 INCH 700 FOOT $330.00 $231,000.00 $300.00 $210,000.00 $367.00 $256,900.00 <br /> 2 CURED IN-PLACE SPOT LINING, 10 INCH 100 FOOT $360.00 $36,000.00 $345.00 $34,500.00 $378.00 $37,800.00 <br /> 3 CURED IN-PLACE SPOT LINING, 12 INCH 40 FOOT $380.00 $15,200.00 $365.00 $14,600.00 $391.00 $15,640.00 <br /> 4 SANITARY SEWER LATERAL REINSTATEMENT 40 EACH $300.00 $12,000.00 $250.00 $10,000.00 $500.00 $20,000.00 <br /> 5 IDEOINSPECTION 170 EACH $100.00 $17,000.00 $0.00 $0.00 $1.00 $170.00 <br /> 6 PROTRUDING LATERAL CUT-OUT 5 EACH $300.00 $1,500.00 $250.00 $1,250.00 $300.00 $1,500.00 <br /> 7 FINAL PROJECT REPORT 1 L SUM $500.00 $500.00 $0.00 $0.00 $500.00 $500.00 <br /> �0����0 <br /> OTAL BIDS(AS CORRECTED) ��� $313,200.00� $270,350.00� $332,510.00 <br /> Percent Over Under ENGINEER'S ESTIMATE -13.68% 6.17% <br /> /Z - �" �� <br /> Matthew C. Newell, P.E.,Acting Dir. Eng.& Infrastructure Date <br />
The URL can be used to link to this page
Your browser does not support the video tag.