Laserfiche WebLink
. <br /> ` � � <br /> boards, and other peripherals are aiso utilized in the SP Lab. Activities in the SP Lab <br /> include but are not limited to; daily GPS Mission Planning, GPS ephemeris Data <br /> Transfer, Data Analyses and Modeling, QA/QC work, weekly Project Review, and <br /> creation and posting of weekly Project Progress Maps and all maps used for field <br /> work. <br /> Special Projects Lab: $4,000 <br /> Data Delivery: <br /> All data will be delivered in an ESRI Personal GIS database (MS Access) format on <br /> CD or DVD format as necessary unless specified otherwise. <br /> Hydrant attribute data will include but will not be limited to: horizontal and vertical <br /> Illinois State Plane East, NAD83 grid coordinates, coordinate quality, geoid <br /> separation, orthometric height, ellipsoid height, hydrant color, number of ports, <br /> presence of steamer, bury depth, manufacturer, hydrant ID, and any other <br /> predetermined attributes values. <br /> Data Delivery: No Fee <br /> DECATUR HYDRANTS MAPPING INITIATIVE COST SUMMARY <br /> Minimum Total Estimated Cost: <br /> GPS Field Services: $ 7,200 , <br /> Estimated Transportation: $ 3,525 <br /> Transportation Supplement $ 1,500 ' <br /> Data Management: $ 4,000 I! <br /> Internship Coordination $ 2,500 ', <br /> GISci Special Projects Lab: $ 4,000 <br /> ArcGIS training for 3 Decatur staff $ 0 <br /> EIU Administrative costs (10%) 2 273 <br /> TOTAL (hydrant GPS/GIS project) $24,998 <br /> 4000 hydrants @ $6.25/ hydrant <br />