|
Project Name: Boyd Road Sanitary Sewer Extension
<br /> Engineer's Estimate Entler Excavating Co.,Inc. Barr 8 Robison Burdick Plumbing 8
<br /> Project Number: 06-13 819 N.Sunnyside Road Sewer 8 Excavating,Inc. Heating,Inc.
<br /> ' Decatur,IL 62522 2332 N.Woodford Street 728 S.Main Street
<br /> City Engineering Division Decatur,IL 62526 Decatur,IL 62521
<br /> Bid Date: Friday,October 20,2006
<br /> ime: 10:00 A.M.
<br /> Fund:
<br /> Organization Code: 45484536
<br /> Object Code: 464010
<br /> 1 SANITARY SEWER,15-INCH 540 LF $56.00 $30,240.00 $59.95 $32,373.00 $66.50 $35,910.00 $79.00 $42,660.00
<br /> 2 ANITARY SEWER,10-INCH,C906 HDPE 90 LF $60.00 $5,400.00 $62.34 $5,610.60 $63.50 $5,715.00 $77.00 $6,930.00
<br /> 3 SANITARYSEWER,10-INCH,C906 HDPE,DIRECTIONAL BORE 55 LF $150.00 $8,250.00 $65.00 $3,575.00 $358.00 $19,690.00 $275.00 $15,125.00
<br /> 4 MANHOLE,4 Ft.Dia.,Ty.A,w/Ty.1 Frame 8 Lid 3 EA $1,750.00 $5,250.00 $3,000.00 $9,000.00 $2,330.00 $6,990.00 $3,000.00 $9,000.00
<br /> 5 TRENCH BACKFILL,CA-6 20 CY $15.00 $300.00 $30.00 $600.00 $19.00 $380.00 $35.00 $700.00
<br /> 6 EXPLORATORY EXCAVATIONS 7 EA $725.00 $5,075.00 $500.00 $3,500.00 $700.00 $4,900.00 $175.00 $1,225.00
<br /> 7 SEEDING,CLASS 1A 02 AC $1,500.00 $300.00 $5,000.00 $1,000.00 $8,000.00 $1,600.00 $5,000.00 $1,000.00
<br /> 8 MULCH,METHOD 1 0.2 AC $330.00 $66.00 $5,000.00 $1,000.00 $500.00 $100.00 $4,000.00 $500.00
<br /> 9 TEMPORARY DITCH CHECKS 5 EA $145.00 $725.00 $300.00 $1,500.00 $145.00 $725.00 $150.00 $750.00
<br /> 10 TRAFFIC CONTROL-STD.7015018�702001 1 LS $1,600.00 $1,600.00 $1,500.00 $1,500.00 $3,500.00 $3,500.00 $2,000.00 $2,000.00
<br /> ���������
<br /> TOTAL BIDS(AS CORRECTED) ��� $57,206.00� $59,658.60� $79,510.00� $80,190.00
<br /> Percent Over Under ENGINEER'S ESTIMATE 4.29% 38.99% 40.18%
<br /> ��� lo -Zv -v6
<br /> Matthew C.Newell,P.E.,Acting Director of Engineering&Infrastructure Date
<br />
|