My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2006-159 ACCEPTING THE BID AND AUTHORIZING A CONTRACT
COD
>
City Clerk
>
RESOLUTIONS
>
2006
>
R2006-159 ACCEPTING THE BID AND AUTHORIZING A CONTRACT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2015 1:53:27 PM
Creation date
11/2/2015 1:53:27 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2006-159
Res Ord Title
ACCEPTING THE BID AND AUTHORIZING THE EXECUTION OF A CONTRACT FIRE STATION #1 BUILDING IMPROVEMENT PROJECT
Approved Date
10/16/2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENGINEERING & INFRASTRUCTURE MEMORANDUM <br /> NO. 2006-61 <br /> October 6, 2006 <br /> TO: Honorable Mayor Osborne and City Council <br /> FROM: Steve Garm ity Manager <br /> Matthew J. osky, Fire Chi <br /> Matthew C. Newell, P.E.,Acti ' ctor of Engineering & Infrastruct�� <br /> ��d <br /> SUBJECT: Fire Station #1 Building Improvement Project, City Project 06-12 <br /> SUMMARY RECOMMENDATION: <br /> It is recommended by staff that the City Council approve the attached resolution awarding the <br /> contract for the Fire Station #1 Building Improvement Project, City Project 06-12, to Interiar , <br /> Specialty Construction, as the lowest responsible bidder in the amount of$48,240.00, and that <br /> the Mayar be authorized to execute the contract, and the City Clerk to attest. � <br /> BACKGROUND: <br /> For several years Fire Station #1 has been plagued by leaks during wet.weather which have <br /> caused water damage to the interior of the building. The City retained a local firm, Architectural <br /> Expressions, to determine the source of the leaks and design the necessary repairs. The building <br /> inspection determined that storm water was entering the building through a roof door on the 3ra <br /> floor and through the window structure on the second floor. <br /> The proposed work includes replacing the second floor windows and the 3`d floor roof door <br /> along with the replacement of water damaged ceiling tiles and wall coverings on the interior of <br /> the building. <br /> The project plans and specifications were prepared by Architectural Expressions, LLP, with <br /> input from Fire Department and Engineering Division staff. The project was advertised through <br /> the Purchasing Division on September 2, 2006, and bids were opened on September 22, 2006. <br /> The results for the letting are as follows: <br /> Compared to <br /> Engineer's Est. <br /> Bidder Bid Price Over (-Under) <br /> Engineer's Estimate $50,000.00 ---- <br /> Interior Specialty Construction $48,240.00 (-3.52 %) <br /> Christy Foltz, Inc. $48,600.00 (-2.80 %) <br /> Jones & Sullivan $52,175.00 4.35 % <br />
The URL can be used to link to this page
Your browser does not support the video tag.