Laserfiche WebLink
. <br /> Project Name: CONCRETE PAVEMENT RESTORATION- <br /> COUNTRY MANOR/FARIES PARKWAY Engineer's Estimate Beniach Construction Co.,Inc. Entler Excvating Compnay,Inc. Christy-Foltz,Inc. Otto Baum Company,Inc. Kinney Contractors,Inc. <br /> Project Number: 06-11 PO Box 20 819 N.Sunnyside Road 740 S.Main Street 1788 Hubbard Avenue 19342 E.Frontage Road <br /> uscola,IL 61953 Decatur,IL 62522 Decatur,IL 62521 Decatur,IL 62526 Raymond,IL 62560 <br /> City Engineering Division <br /> Bid Date: Monday,July 31,2006 <br /> ime: 70:00 A.M. <br /> Fund: CAPITAL STREET PROJECTS <br /> Organization Code: 45484516 <br /> Object Code: 460103 <br /> Item Pay Item QTY Unit Unit Prlce Total Unit Price Total Unit Prlce Total Unit Price Total Unit Price Total Unit Price Total <br /> Number <br /> 20800150 RENCH BACKFILL 10 CU YD $25.00 $250.00 $24.00 $240.00 $40.00 $400.00 $25.00 $250.00 $38.50 $385.00 $30.00 $300.00 <br /> 25200100 ODDING,18 INCH 22 SQ YD $7.50 $1,687.50 $12.00 $2,700.00 $7.00 $1,575.00 $5.00 $1,125.00 $11.00 $2,475.00 $7.60 $1,710.00 <br /> 30200300 PROCESSED LIME MODIFIED SOILS,S INCH 3,460 SQ YD $9.00 $31,140.00 $7.00 $24,220.00 $8.50 $29,410.00 $7.50 $25,950.00 $10.25 $35,465.00 $7.10 $24,566.00 <br /> 30201500 LIME 62 TONS $75.00 $4,650.00 $77.00 $4,774.00 $68.00 $4,216.00 $64.00 $3,968.00 ' $67.00 $4,154.00 $60.00 $3,720.00 <br /> 35101400 GGREGATE BASE COURSE,TYPE B 8 TONS $35.00 $2,975.00 $24.00 $2,040.00 $35.00 $2,975.00 $37.00 $3,145.00 $22.00 $1,870.00 $34.00 $2,890.00 <br /> 42000100 PORTLAND CEMENT CONCRETE PAVEMENT,6 INCH 2,800 SQ YD $32.00 $89,600.00 $30.00 $84,000.00 $39.00 $109,200.00 $35.00 $98,000.00 $40.00 $112,000.00 $54.00 $151,200.00 <br /> 42000501 PORTLAND CEMENT CONCRETE PAVEMENT,10 INCH(JOINTED) 660 SQ YD $50.00 $33,000.00 $56.00 $36,960.00 $52.00 $34,320.00 $50.00 $33,000.00 $51.00 $33,660.00 $76.00 $50,160.00 <br /> 42300200 PORTLAND CEMENT CONCRETE DRIVEWAY PAVEMENT,6 INCH 70 SQ YD $45.00 $3,150.00 $43.00 $3,010.00 $49.00 $3,430.00 $25.00 $1,750.00 $46.00 $3,220.00 $51.00 $3,570.00 <br /> 42400200 PORTLAND CEMENT CONCRETE SIDEWALK,5 INCH 1,300 SQ FT $4.00 $5,200.00 $7.00 $9,100.00 $4.30 $5,590.00 $4.50 $5,850.00 $4.50 $5,850.00 $7.00 $9,100.00 <br /> 42400400 PORTLAND CEMENT CONCRETE SIDEWALK,6 INCH 57 SQ FT $4.50 $2,587.50 $7.30 $4,197.50 $5.40 $3,105.00 $5.00 $2,875.00 $4.75 $2,731.25 $10.00 $5,750.00 <br /> 44000100 PAVEMENT REMOVAL 3,460 SQ YD $9.50 $32,870.00 $6.50 $22,490.00 $13.50 $46,710.00 $19.00 $65,740.00 $21.00 $72,660.00 $10.00 $34,600.00 <br /> 44000200 DRIVEWAY PAVEMENT REMOVAL 70 SQ YD $8.50 $595.00 $6.50 $455.00 $14.00 $980.00 $19.00 $1,330.00 $21.00 $1,470.00 $10.00 $700.00 <br /> 44000500 COMBINATION CONCRETE CURB AND GUTTER REMOVAL 1,050 FOOT $7.00 $7,350.00 $6.00 $6,300.00 $8.00 $8,400.00 $6.00 $6,300.00 $11.00 $11,550.00 $7.50 $7,875.00 <br /> 44000600 SIDEWALK REMOVAL 210 SQ YD $13.50 $2,835.00 $6.50 $1,365.00 $26.00 $5,460.00 $18.00 $3,780.00 $18.75 $3,937.50 $2.00 $420.00 <br /> 44200901 CLASS B PATCHES,TYPE 1,6 INCH 5 SQ YD $76.00 $380.00 $175.00 $875.00 $51.00 $255.00 $180.00 $900.00 $138.00 $690.00 $95.00 $475.00 <br /> 44200905 CLASS B PATCHES,TYPE II,6 INCH 20 SQ YD $74.00 $1,480.00 $150.00 $3,000.00 $51.00 $1,020.00 $165.00 $3,300.00 $107.00 $2,140.00 $78.00 $1,560.00 <br /> 44200909 LASS B PATCHES,TYPE III,6 INCH 50 SQ YD $72.00 $3,600.00 $125.00 $6,250.00 $51.00 $2,550.00 $130.00 $6,500.00 $94.00 $4,700.00 $74.00 $3,700.00 <br /> 44200911 LASS B PATCHES,TYPE IV,6 INCH 260 SQ YD $70.00 $18,200.00 $115.00 $29,900.00 $51.00 $13,260.00 $125.00 $32,500.00 $66.50 $17,290.00 $70.00 $18,200.00 <br /> 44213000 PATCHING REINFORCEMENT 310 SQ YD $22.00 $6,820.00 $6.00 51,860.00 $5.00 $1,550.00 $9.00 $2,790.00 $18.75 $5,812.50 $20.00 $6,200.00 <br /> 44213200 W CUTS 3,640 FOOT $4.60 $16,744.00 $2.40 $8,736.00 $4.00 $14,560.00 $7.50 $27,300.00 $3.75 $13,650.00 $0.01 $36.40 <br /> 550A0050 STORM SEWERS,CLASS A,TYPE 1,121NCH 35 FOOT $45.00 $1,575.00 $40.00 $1,400.00 $40.00 $1,400.00 $35.00 $1,225.00 $49.50 $1,732.50 $50.00 $1,750.00 <br /> 60236800 INLETS,TYPE A,TYPE 11 FRAME AND GRATE 1 EACH $1,500.00 $1,500.00 $1,500.00 $1,500.00 $450.00 $450.00 $500.00 $500.00 $880.00 $880.00 $785.00 $785.00 <br /> 60255800 MANHOLES TO BE ADJUSTED WITH NEW TYPE 1 FRAME,CLOSED LID EACH $625.00 $1,875.00 $600.00 $1,800.00 $1,000.00 $3,000.00 $600.00 $1,800.00 $495.00 $1,485.00 $750.00 $2,250.00 <br /> 60300410 ALVE BOX FRAMES TO BE ADJUSTED WITH NEW FRAMES 4 EACH $250.00 $1,000.00 $265.00 $1,060.00 $400.00 $1,600.00 $550.00 $2,200.00 $220.00 $880.00 $210.00 $840.00 <br /> 60604400 OMBINATION CONCRETE CURB AND GUTTER,TYPE B-6.18 30 FOOT $37.00 $1,110.00 $30.00 $900.00 $42.00 $1,260.00 $20.00 $600.00 $37.50 $1,125.00 $35.00 $1,050.00 <br /> 60609800 OMBINATION CONCRETE CURB AND GUTTER,TYPE M-6.18 1,125 FOOT $37.00 $41,625.00 $30.00 $33,750.00 $26.00 $29,250.00 $23.00 $25,875.00 $24.00 $27,000.00 $29.00 $32,625.00 <br /> 70106450 RAFFIC CONTROL AND PROTECTION 1 L SUM $7,500.00 $7,500.00 $18,500.00 $18,500.00 $6,500.00 $6,500.00 $8,000.00 $8,000.00 $10,000.00 $10,000.00 $16,000.00 $16,000.00 <br /> Z0017100 DOWELL BAR 180 EACH $30.00 $5,400.00 $15.00 $2,700.00 $2.50 $450.00 $8.00 $1,440.00 $14.00 $2,520.00 $15.00 $2,700.00 <br /> Z0075300 IE BAR 125 EACH $30.00 $3,750.00 $10.00 $1,250.00 $2.50 $312.50 $9.00 $1,125.00 $14.00 $1,750.00 $10.00 $1,250.00 <br /> XX001877 SUMP PUMP LINE CONNECTION EACH $150.00 $750.00 $200.00 $1,000.00 $250.00 $1,250.00 $75.00 $375.00 $440.00 $2,200.00 $150.00 $750.00 <br /> OTAL BIDS(AS CORRECTED) ��� <br /> $331,199.00 $316,332.50 $334,438.50 $369,493.00 $385,282.75 $386,732.40 <br /> Percent Over Under ENGINEER'S ESTIMATE ���� -4.49% 0.98% 11.56% 16.33% 22.26% <br /> %%�G�Gi %�i�� �- 3 /- v 6 <br /> Matthew C.Newell,P.E.,City Engineer Date <br />