My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2006-113 AUTHORIZING AGREEMENT
COD
>
City Clerk
>
RESOLUTIONS
>
2006
>
R2006-113 AUTHORIZING AGREEMENT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2015 4:11:28 PM
Creation date
11/2/2015 4:11:28 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2006-113
Res Ord Title
AUTHORIZING AGREEMENT ARCHER DANIELS MIDLAND COMPANY SECONDARY CONTAINMENT
Approved Date
7/25/2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COUNCIL COMMUNICATION FORM <br /> Engineering & Infrastructure Memorandum <br /> NO. 2006-45 <br /> July 21, 2006 <br /> TO: Honorable Mayor Osborne and City Council <br /> FROM: Steve Gar City Manager <br /> Stephen S on, P.E.,Director of Engineering & Infrastructure <br /> SUBJECT: Agreement ith Archer Daniels Midland Company <br /> SUMMARY RECOMMENDATION: <br /> It is recommended by City staff that the City Council approve the attached resolution authorizing <br /> the Mayor to execute and the City Clerk to attest an Agreement with the Archer Daniels Midland <br /> Company for Secondary Containment. I <br /> BACKGROUND: <br /> The City Engineer was contacted by a representative from Archer Daniels Midland Company <br /> (ADM) inquiring about the possibility of the City agreeing to let ADM use a City drainage <br /> facility for secondary containment. ADM explained they are looking to find storage locations to <br /> temporarily store vegetable oil and determined a tank located at 2301 North 22°d Street is empty. <br /> This tank has a usable capacity of about 1.7 million gallons but a shell capacity of about 4.1 <br /> million gallons. <br /> ADM, in order to have its Spill Pollution Control and Containment (SPCC)plan certified by the <br /> Environmental Protection Agency(EPA), must show that secondary containment exists in the <br /> event a tank should fail. Presently on-site secondary containment exists to manage the 1.7 <br /> million gallons of oil planned to be stored in the tank. However, the EPA requires the secondary <br /> containment to equal the capacity of the entire tank. This requires ADM to provide an additional <br /> 2.4 million gallons in secondary containment. ADM, in considering its options to meet this <br /> requirement noted the City's storm water detention facility located west of ADM's tank site <br /> (refer to attached map). <br /> It was for this reason the City was contacted and asked if it would allow ADM to use the City's <br /> property as part of its containment plan to meet EPA requirements. ADM's representative in <br /> making its request of staff commented that the need to use the City's property should never occur <br /> as ADM would not exceed the usable capacity of the tank. In addition, ADM would arrange to <br /> have the needed improvements to the detention site designed and constructed at its expense. City <br /> staff agreed to consider the request. <br />
The URL can be used to link to this page
Your browser does not support the video tag.