Laserfiche WebLink
_ . , , <br /> COUNCIL COMMUNICATION FORM <br /> Engineering & Infrastructure Memorandum <br /> NO. 2006-35 <br /> May 25, 2006 <br /> TO: Honorable Mayor Osborne and City Council <br /> FROM: Steve Garm City Manager <br /> Stephen Sw n, P.E., Director of Engine ring & Infrastructure <br /> Matthew C. Ne ell, P.E., City Engineer� <br /> M. Travis Stanley, Civil Engineer I��,/ � <br /> N���� <br /> SUBJECT: Sidewalk Replacement Project, City Project 06-21 <br /> SUMMARY RECOMMENDATION: <br /> It is recommended by staff that the City Council approve the attached resolution on the following items: <br /> 1. Authorizes awarding the contract for the Sidewalk Replacement Project, City Project 06- <br /> 21, to WAS CON Co., as the lowest, responsible bidder in the amount of$98,550.00, <br /> and that the Mayor be authorized to execute the contract, and the City Clerk to attest, <br /> and; <br /> 2. Authorizes the City Manager and the Director of Engineering and Infrastructure to <br /> increase the contract amount by $16,450, not to exceed $115,000.00, for the <br /> construction or repair of additional sidewalks in the City as needed. <br /> BACKGROUND: <br /> The purpose of the Sidewalk Replacement Project is to improve the City's sidewalk system by replacing <br /> deteriorated sidewalks and ramps along with some limited installation of new sidewalks at various <br /> locations in the City. <br /> The project plans and specifications were prepared by Engineering Division staff. The project was <br /> advertised May 5, 2006, and bids were opened on May 19, 2006. The results for the letting are as <br /> follows: <br /> Compared to <br /> Engineer's Est. <br /> Bidder Bid Price Over (-Under) <br /> Engineer's Estimate $119,582.50 ----- <br /> WAS CON Co. $ 98,550.00 (- 17.59%) <br /> Otto Baum Co., Inc. $111,255.00 (- 6.96%) <br /> Entler Excavating Co., Inc. $133,025.00 11.24% <br /> The proposed sidewalk contract for this fiscal year incorporates three sidewalk initiatives identified for <br /> the General Street Capital Fund: Sidewalk Improvements, Sidewalk Ramp Program, and Sidewalk <br /> Extension Program. Since these projects are similar in nature, in the interest of obtaining the best <br /> possible bids, staff has combined these projects under one contract. <br /> As in past years, the sidewalk contract contains the flexibility to add sidewalk quantities to the contract <br /> as deteriorated segments are identified as causing a safety hazard or a general nuisance to the public. <br /> These segments are generally identified by a combination of citizen complaints and staff investigation. <br /> The sidewalk contract allows the City to retain the services of the low bid contractor to perform <br /> additional sidewalk work as the need arises over the course of the fiscal year. <br />