Laserfiche WebLink
• r • ,ti <br /> COUNCIL COMMUNICATION FORM <br /> Engineering & Infrastructure Memorandum <br /> NO. 2006-32 <br /> May 25, 2006 <br /> TO: Honorable Mayor Osborne and City Council <br /> FROM: Steve Garm ity Manager <br /> Stephen Sw s n, P.E.,Director of Engineering& Infrastructure�%V' <br /> Matthew C. ell,P.E., City Engineer`�� <br /> SUBJECT: Street Restoration, City Project 06-08, Section No. 06-00608-00-FP ' <br /> SUMMARY RECOMMENDATION: ' <br />' It is recommended by staff that the City Council approve the attached resolution awarding the <br /> contract for Street Restoration, City Project 06-08, to Dunn Company, A Division of Tyrolt, <br /> Inc., as the lowest, responsible bidder in the amount of$2,044,548.20, and that the Mayor be <br /> authorized to execute the contract and the City Clerk to attest. <br /> BACKGROUND: <br /> The Engineering Division inspects and rates approximately 1/2 of the City's streets on a yearly <br /> basis. The results of these inspections are input into a computer database which is used to <br /> project the future condition of the streets based on their current condition, historical condition, <br /> surface type(i.e. brick, concrete, asphalt, etc.), average daily traffic, and traffic type (i.e. trucks, <br /> cars, etc.). This data is then paired with available funding and is used as a basis to aid City <br /> Engineering in the preparation of the City's yearly street improvement program. Staff then <br /> determines which streets need to have the surface restored or be totally reconstructed. <br /> The Street Restoration Project generally involves the placement of a 1 to 2 inch asphalt surface <br /> course on an existing paved surface. A portion of the existing pavement is often milled off to <br /> reduce the impact of the overlay on existing curbs and driveways. If additional structural <br /> capacity is desired in the pavement,no milling may take place prior to the overlay. The two <br /> main purposes of the Street Restoration Project are (1)to increase the useful life of a pavement <br /> in advance of its deteriorating to a condition that would require its complete reconstruction and <br /> (2)to improve the street's ride ability. This year's program includes approximately 7.13 <br /> centerline miles of streets in the City. A listing of streets in this year's project is attached. <br /> The project specifications were prepared by the Engineering Division and approved by the <br /> Illinois Department of Transportation(IDOT) for the use of Motor Fuel Tax funds. The project <br /> was initially advertised in mid-April with bids opened on May 3, 2006. The bid received was <br /> approximately$275,000 in excess of the funding available in the City's Motor Fuel Tax Fund <br /> and was therefore rejected. <br /> Due largely to the high cost of petroleum, asphalt prices in 2006 have increased over 30% <br /> above the bids received in 2005. Engineering staff had anticipated a 15%to 20% increase. <br />