Laserfiche WebLink
EXHIBIT A <br /> DEVELOPMENT PROJECT <br /> A. GENERAL NARRATIVE DESCRIPTION OF DEVELOPMENT PROJECT: <br />' Rehabilitation of existing structure to include the addition of two (2)residential dwelling <br /> units and rehabilitation of entire Main Street fa�ade. <br /> (1) Construction(including Renovation,Repair& <br /> Remodeling) <br /> a. Estimated costs $ 350 000 <br /> , <br /> b. Estimate igi e <br /> Redevelopment Project Costs $ 65,000 <br /> c. Attach site plans or elevations <br /> (2) Anticipated Incremental Real Estate Taxes <br /> a. Real Estate Taxes(annual) $ 7,500 <br /> b. City Sales Ta�ces(annual) $ -0- <br /> c. State Sales Taxes(annual) $ -0-' <br /> (3) Jobs Created or Retained(full-time <br /> equivalents) <br /> Construction: 3 <br /> Operational: 1 <br /> B. TIMETABLE/MII�ESTONES <br /> Commence Construction June 1,2007 <br /> Complete Construction <br /> Facade Renovations June l,2008 <br /> Residential Occupancy* June 1,2008 <br />